Period 4 of 2024-25
Previous periodNext periodAll periods
How the period went
In Period 4 of 2024-25, 6,945,180 scheduled station stops were recorded across Great Britain. 85.2% of recorded arrivals came within three minutes of the timetable and 3.6% of scheduled stops were cancelled.
Compared with Period 3 of 2024-25, the biggest rises among stations with at least 1,500 scheduled stops were at Southampton Central (up 9.3 points to 78.5%), Pokesdown (up 6.8 points to 79.5%), New Milton (up 6.6 points to 80.0%), Penrith (North Lakes) (up 6.5 points to 55.9%) and Christchurch (up 6.1 points to 79.2%).
Compared with Period 3 of 2024-25, the biggest falls were at Gloucester (down 10.9 points to 65.9%), Yate (down 10.2 points to 73.4%), Cheltenham Spa (down 9.3 points to 63.5%), Severn Tunnel Junction (down 8.8 points to 69.6%) and Thatcham (down 7.1 points to 73.6%).
Against the same period a year earlier, Period 4 of 2024-25 brought the biggest improvements at Wrexham General (up 21.5 points to 80.6%), Shotton (up 16.8 points to 75.9%), Hereford (up 13.6 points to 75.4%) and Stonehaven (up 10.9 points to 80.4%).
Against the same period a year earlier, Period 4 of 2024-25 brought the biggest drops at Radlett (down 19.8 points to 69.4%), Mill Hill Broadway (down 19.8 points to 68.9%), Elstree and Borehamwood (down 19.6 points to 68.7%) and Cardiff Bay (down 19.2 points to 80.4%).
5 stations had their best figure on record in Period 4 of 2024-25; the busiest of them were Anderston (93.0%), Moulsecoomb (97.1%), Swanwick (91.0%), Woolston (92.2%) and Robertsbridge (87.6%).
Least punctual stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Honiton | 1,052 | 52.5% | 1.9% |
| Pewsey | 568 | 52.7% | 6.2% |
| Axminster | 1,052 | 54.0% | 1.4% |
| Yeovil Junction | 1,350 | 55.2% | 1.6% |
| Pershore | 1,018 | 55.3% | 5.2% |
| Penrith (North Lakes) | 1,811 | 55.9% | 5.2% |
| Moreton-in-Marsh | 1,114 | 56.7% | 5.5% |
| Ashchurch for Tewkesbury | 1,052 | 57.5% | 7.2% |
Most cancellations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Whitchurch (Cardiff) | 1,482 | 73.6% | 16.3% |
| Rhiwbina | 1,482 | 78.7% | 16.1% |
| Birchgrove | 1,482 | 80.7% | 15.8% |
| Ashton-under-Lyne | 734 | 86.7% | 13.8% |
| Kew Gardens | 4,104 | 86.4% | 13.3% |
| Poulton-le-Fylde | 3,424 | 85.0% | 13.2% |
| Blackpool North | 3,553 | 86.4% | 13.1% |
| Coryton | 1,482 | 80.3% | 13.1% |
Operators
| Operator | Within 3 min | Cancelled |
|---|---|---|
| Greater Anglia | 94.4% | 1.1% |
| c2c | 94.1% | 2.1% |
| Elizabeth line | 91.5% | 3.2% |
| London Overground | 91.4% | 2.9% |
| Merseyrail | 90.3% | 2.6% |
| ScotRail | 90.2% | 2.6% |
| Chiltern Railways | 89.3% | 1.2% |
| Heathrow Express | 88.5% | 8.0% |
| Southeastern | 86.2% | 1.8% |
| South Western Railway | 85.8% | 2.1% |
| GTR | 84.2% | 4.5% |
| West Midlands Railway | 81.8% | 4.0% |
| Transport for Wales | 80.7% | 4.0% |
| Northern | 80.6% | 6.3% |
| Great Western Railway | 77.6% | 4.9% |
| East Midlands Railway | 73.4% | 3.4% |
| TransPennine Express | 73.1% | 3.3% |
| LNER | 72.1% | 4.4% |
| CrossCountry | 68.5% | 6.0% |
| Avanti | 57.2% | 5.3% |
Areas
| Area | Within 3 min | Cancelled |
|---|---|---|
| Scotland | 89.8% | 2.7% |
| London | 89.3% | 3.0% |
| East of England | 88.3% | 3.4% |
| South East | 83.5% | 3.0% |
| North West | 83.1% | 4.6% |
| Wales | 80.6% | 4.5% |
| North East | 80.5% | 5.5% |
| West Midlands | 79.3% | 3.6% |
| Yorkshire and The Humber | 77.4% | 5.5% |
| East Midlands | 76.8% | 3.7% |
| South West | 75.8% | 5.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out