Honiton
HONSouth WestManaged by South Western Railway
How this station is performing
Honiton had 11,494 scheduled stops to Period 7 of 2026-27, about 32 a day. 59.5% of recorded arrivals were within three minutes of the timetable and 3.2% of scheduled stops were cancelled.
Honiton opened on 19 July 1860, 166 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Honiton is the oldest; the next oldest, Feniton, dates from 1860.
The nearest stations to Honiton are Feniton (7.0 km west), Whimple (12.2 km west), Axminster (12.9 km east), Cranbrook (Devon) (17.2 km west) and Tiverton Parkway (18.1 km north-west). 1 stations lie within 10 km in all. Of the five, Whimple is the most punctual at 70.2% and Tiverton Parkway the least at 57.1%, with Honiton on 59.5%.
Honiton is one of 2 stations named after a town called Honiton, home to about 11,334 people; this one stands 0.4 km from its centre.
Across the whole run of data, the weakest four-week period for Honiton was Period 9 of 2024-25, at 20.0%, some time before the latest year. The strongest was Period 7 of 2025-26, at 89.7%, and the two are 69.7 percentage points apart. Cancellations peaked at 10.5% of scheduled stops in Period 10 of 2023-24, against 3.2% over the latest 13 periods.
2 of 3 stations of a similar size in South West are more punctual than Honiton on 59.5%. The comparison group includes Axminster (58.8%), Devonport (82.2%) and Cranbrook (Devon) (68.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 11,155 | 59.6% | 2.3% |
| Great Western Railway | 339 | – | – |
Operators with their own page for this station are linked to it.
Late train at Honiton? Delay Repay
These operators call at Honiton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 566 | 63.3% | 3.7% |
| Period 6 of 2026-27 | 562 | 62.7% | 3.7% |
| Period 5 of 2026-27 | 822 | 37.0% | 5.0% |
| Period 4 of 2026-27 | 1,006 | 40.4% | 4.6% |
| Period 3 of 2026-27 | 1,027 | 58.7% | 3.0% |
| Period 2 of 2026-27 | 1,050 | 54.2% | 4.1% |
| Period 1 of 2026-27 | 1,105 | 53.2% | 2.2% |
| Period 13 of 2025-26 | 1,085 | 67.6% | 1.8% |
| Period 12 of 2025-26 | 1,048 | 76.4% | 2.6% |
| Period 11 of 2025-26 | 923 | 61.6% | 3.0% |
| Period 10 of 2025-26 | 959 | 63.7% | 2.8% |
| Period 9 of 2025-26 | 729 | 62.2% | 1.2% |
| Period 8 of 2025-26 | 612 | 78.3% | 4.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Axminster | 11,453 | 58.8% | 2.8% |
| Devonport | 11,120 | 82.2% | 4.1% |
| Cranbrook (Devon) | 11,111 | 68.8% | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out