ScotRail delays and reliability
How this operator is doing
ScotRail had 9,542,892 scheduled station stops across 362 stations in the 13 four-week periods to Period 7 of 2026-27. 87.9% of the stops with a recorded arrival came within three minutes of the timetable, and 1.6% of scheduled stops were cancelled.
The oldest stations ScotRail calls at are Gartcosh (1831), Stepps (1831) and Broughty Ferry (1838), and the newest are Inverness Airport (2023), Edinburgh Gateway (2016) and Tweedbank (2015).
ScotRail's northernmost stations are Thurso and Georgemas Junction and its southernmost are Carlisle and Stranraer.
The most isolated stations on the ScotRail network are Stranraer (26.0 km from Barrhill), Wick (22.1 km from Georgemas Junction) and Perth (20.2 km from Dunkeld and Birnam).
ScotRail is among the most reliable operators at running its trains. 1.6% of scheduled stops were cancelled, which ranks 3rd lowest of 23, against a national median of 2.7% for stations.
Experience varies widely across the 312 ranked stations of ScotRail. The best-served tenth reach 95.2% or more, the median is 87.7% and the worst tenth manage 77.6% or less, a spread of 17.6 percentage points. 103 stations fall below 85%.
Across the whole run of data, the weakest four-week period for ScotRail was Period 8 of 2024-25, at 81.6%, some time before the latest year. The strongest was Period 2 of 2023-24, at 92.2%, and the two are 10.6 percentage points apart.
Delay Repay
ScotRail pays Delay Repay for a delay of 30 minutes or more, starting at 50% of a single ticket. The page sets the rules beside how often its trains run late. Read the ScotRail Delay Repay rules
Period by period
Least punctual stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Dalwhinnie | 3,371 | 51.9% | 1.2% |
| Blair Atholl | 3,555 | 53.8% | 1.1% |
| Arrochar and Tarbet | 4,387 | 55.7% | 0.8% |
| Helensburgh Upper | 4,387 | 58.2% | 0.8% |
| Garelochhead | 4,387 | 58.3% | 0.8% |
| Crianlarich | 6,179 | 60.4% | 0.9% |
Most punctual stations
Busiest stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Glasgow Central | 362,184 | 88.9% | 1.4% |
| Edinburgh | 223,595 | 87.6% | 1.3% |
| Glasgow Queen Street | 199,820 | 86.8% | 1.1% |
| Haymarket | 184,685 | 86.7% | 1.4% |
| Partick | 145,005 | 83.0% | 1.8% |
| Hyndland | 143,336 | 82.7% | 2.0% |
Where it runs
| Area | Share of stops | Within 3 min | Cancelled |
|---|---|---|---|
| Scotland | 100% | 87.9% | 1.7% |
| North West | 0% | 85.9% | 0.9% |
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 735,467 | 86.1% | 1.5% |
| Period 6 of 2026-27 | 735,537 | 89.5% | 1.2% |
| Period 5 of 2026-27 | 735,990 | 88.2% | 1.4% |
| Period 4 of 2026-27 | 736,796 | 88.3% | 2.3% |
| Period 3 of 2026-27 | 737,481 | 89.5% | 1.6% |
| Period 2 of 2026-27 | 735,999 | 89.1% | 1.2% |
| Period 1 of 2026-27 | 851,080 | 89.7% | 1.6% |
| Period 13 of 2025-26 | 708,067 | 89.7% | 1.4% |
| Period 12 of 2025-26 | 730,647 | 89.7% | 1.3% |
| Period 11 of 2025-26 | 729,819 | 88.6% | 1.3% |
| Period 10 of 2025-26 | 641,186 | 86.4% | 1.8% |
| Period 9 of 2025-26 | 732,775 | 83.4% | 3.0% |
| Period 8 of 2025-26 | 732,048 | 84.3% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out