CrossCountry delays and reliability
How this operator is doing
CrossCountry had 1,131,452 scheduled station stops across 129 stations in the 13 four-week periods to Period 7 of 2026-27. 63.2% of the stops with a recorded arrival came within three minutes of the timetable, and 5.9% of scheduled stops were cancelled.
The oldest stations CrossCountry calls at are Crewe (1837), Penkridge (1837) and Stafford (1837), and the newest are Worcestershire Parkway (2020), Cambridge North (2017) and Stansted Airport (1991).
CrossCountry's northernmost stations are Aberdeen and Stonehaven and its southernmost are Penzance and St Erth.
The most isolated stations on the CrossCountry network are Stamford (Lincs) (17.3 km from Oakham), Tiverton Parkway (15.4 km from Feniton) and Melton Mowbray (14.2 km from Oakham).
CrossCountry has slipped sharply. 63.2% of stops came within three minutes of the timetable in the latest 13 periods, 5.7 percentage points worse than the 68.9% recorded in the 13 before. Cancellations rose to 5.9% of scheduled stops from 5.2%, which is 0.7 percentage points more.
Across the whole run of data, the weakest four-week period for CrossCountry was Period 9 of 2024-25, at 55.2%, some time before the latest year. The strongest was Period 13 of 2024-25, at 77.0%, and the two are 21.8 percentage points apart.
Delay Repay
CrossCountry pays Delay Repay for a delay of 30 minutes or more, starting at 50% of a single ticket. The page sets the rules beside how often its trains run late. Read the CrossCountry Delay Repay rules
Period by period
Least punctual stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Sheffield | 16,885 | 51.7% | 3.4% |
| Birmingham International | 11,555 | 52.1% | 4.8% |
| Banbury | 16,302 | 53.1% | 5.0% |
| Wakefield Westgate | 10,385 | 53.4% | 4.9% |
| Chesterfield | 11,982 | 54.2% | 2.6% |
| Coventry | 11,547 | 54.6% | 4.8% |
Most punctual stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Spondon | 2,357 | 83.7% | 5.3% |
| Caldicot | 1,760 | 80.4% | 16.1% |
| Nottingham | 19,935 | 79.7% | 8.1% |
| Severn Tunnel Junction | 1,762 | 78.8% | 16.1% |
| Chepstow | 6,578 | 77.6% | 11.8% |
| Stansted Airport | 11,489 | 77.3% | 6.6% |
Busiest stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Birmingham New Street | 86,296 | 57.6% | 4.8% |
| Derby | 37,561 | 65.0% | 5.4% |
| Cheltenham Spa | 30,538 | 60.3% | 6.8% |
| Tamworth | 27,910 | 68.2% | 5.6% |
| Burton-on-Trent | 27,599 | 68.9% | 5.5% |
| Coleshill Parkway | 23,436 | 66.2% | 3.3% |
Where it runs
| Area | Share of stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands | 30% | 61.4% | 5.3% |
| East Midlands | 18% | 68.8% | 4.7% |
| South West | 17% | 62.5% | 8.2% |
| South East | 9% | 58.7% | 5.2% |
| East of England | 6% | 65.3% | 4.3% |
| North West | 6% | 59.6% | 6.7% |
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 86,366 | 58.5% | 5.9% |
| Period 6 of 2026-27 | 88,537 | 56.0% | 7.1% |
| Period 5 of 2026-27 | 87,840 | 56.7% | 5.5% |
| Period 4 of 2026-27 | 88,523 | 55.8% | 6.0% |
| Period 3 of 2026-27 | 85,352 | 61.5% | 5.9% |
| Period 2 of 2026-27 | 86,806 | 62.2% | 7.0% |
| Period 1 of 2026-27 | 99,872 | 69.4% | 3.7% |
| Period 13 of 2025-26 | 93,824 | 71.0% | 4.8% |
| Period 12 of 2025-26 | 84,073 | 73.2% | 3.7% |
| Period 11 of 2025-26 | 85,224 | 72.4% | 5.8% |
| Period 10 of 2025-26 | 76,590 | 65.6% | 10.0% |
| Period 9 of 2025-26 | 85,830 | 55.4% | 7.5% |
| Period 8 of 2025-26 | 82,615 | 62.5% | 4.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out