Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

LNER delays and reliability

London North Eastern Railway

On time, last 13 periods67.6%Great Britain: 83.6%
Cancelled2.9%Great Britain: 3.2%
Stations64With records
Punctuality rank20th of 23Among ranked operators

How this operator is doing

LNER had 501,247 scheduled station stops across 64 stations in the 13 four-week periods to Period 7 of 2026-27. 67.6% of the stops with a recorded arrival came within three minutes of the timetable, and 2.9% of scheduled stops were cancelled.

The oldest stations LNER calls at are Middlesbrough (1830), Selby (1834) and Carnoustie (1838), and the newest are Welwyn Garden City (1920), Carrbridge (1892) and Thornaby (1882).

LNER's northernmost stations are Inverness and Carrbridge and its southernmost are London Kings Cross and Alexandra Palace.

The most isolated stations on the LNER network are Perth (20.2 km from Dunkeld and Birnam), Dunkeld and Birnam (18.9 km from Pitlochry) and Gleneagles (17.6 km from Dunblane).

LNER has slipped sharply. 67.6% of stops came within three minutes of the timetable in the latest 13 periods, 5.3 percentage points worse than the 72.9% recorded in the 13 before. Cancellations rose to 2.9% of scheduled stops from 1.9%, which is 1.0 percentage points more.

Across the whole run of data, the weakest four-week period for LNER was Period 8 of 2023-24, at 58.9%, some time before the latest year. The strongest was Period 1 of 2023-24, at 78.2%, and the two are 19.3 percentage points apart. Cancellations peaked at 10.9% of scheduled stops in Period 8 of 2023-24, against 2.9% over the latest 13 periods.

Delay Repay

LNER pays Delay Repay for a delay of 30 minutes or more, starting at 50% of a single ticket. The page sets the rules beside how often its trains run late. Read the LNER Delay Repay rules

Period by period

60%70%80%90%2023-242024-252025-262026-27Period 1 of 2023-24: 78.2%Period 2 of 2023-24: 76.5%Period 3 of 2023-24: 71.9%Period 4 of 2023-24: 77.4%Period 5 of 2023-24: 76.2%Period 6 of 2023-24: 76.2%Period 7 of 2023-24: 70.7%Period 8 of 2023-24: 58.9%Period 9 of 2023-24: 65.1%Period 10 of 2023-24: 63.0%Period 11 of 2023-24: 71.6%Period 12 of 2023-24: 72.3%Period 13 of 2023-24: 76.1%Period 1 of 2024-25: 76.0%Period 2 of 2024-25: 75.9%Period 3 of 2024-25: 75.9%Period 4 of 2024-25: 72.1%Period 5 of 2024-25: 72.6%Period 6 of 2024-25: 72.9%Period 7 of 2024-25: 71.8%Period 8 of 2024-25: 74.7%Period 9 of 2024-25: 61.5%Period 10 of 2024-25: 71.3%Period 11 of 2024-25: 69.8%Period 12 of 2024-25: 73.0%Period 13 of 2024-25: 77.4%Period 1 of 2025-26: 75.8%Period 2 of 2025-26: 73.5%Period 3 of 2025-26: 76.4%Period 4 of 2025-26: 74.3%Period 5 of 2025-26: 68.5%Period 6 of 2025-26: 75.7%Period 7 of 2025-26: 74.6%Period 8 of 2025-26: 72.6%Period 9 of 2025-26: 68.7%Period 10 of 2025-26: 68.1%Period 11 of 2025-26: 69.4%Period 12 of 2025-26: 71.1%Period 13 of 2025-26: 72.7%Period 1 of 2026-27: 66.4%Period 2 of 2026-27: 66.1%Period 3 of 2026-27: 65.0%Period 4 of 2026-27: 64.7%Period 5 of 2026-27: 62.8%Period 6 of 2026-27: 64.3%Period 7 of 2026-27: 67.5%
This pageGreat Britain
0%5%10%15%Period 1 of 2023-24: 2.2%Period 2 of 2023-24: 3.2%Period 3 of 2023-24: 2.1%Period 4 of 2023-24: 1.3%Period 5 of 2023-24: 2.1%Period 6 of 2023-24: 1.4%Period 7 of 2023-24: 3.2%Period 8 of 2023-24: 10.9%Period 9 of 2023-24: 3.7%Period 10 of 2023-24: 10.0%Period 11 of 2023-24: 4.0%Period 12 of 2023-24: 2.4%Period 13 of 2023-24: 3.4%Period 1 of 2024-25: 1.9%Period 2 of 2024-25: 3.2%Period 3 of 2024-25: 3.3%Period 4 of 2024-25: 4.4%Period 5 of 2024-25: 5.5%Period 6 of 2024-25: 2.9%Period 7 of 2024-25: 3.6%Period 8 of 2024-25: 1.0%Period 9 of 2024-25: 3.5%Period 10 of 2024-25: 2.0%Period 11 of 2024-25: 3.0%Period 12 of 2024-25: 2.1%Period 13 of 2024-25: 1.3%Period 1 of 2025-26: 1.9%Period 2 of 2025-26: 1.6%Period 3 of 2025-26: 1.1%Period 4 of 2025-26: 1.6%Period 5 of 2025-26: 3.6%Period 6 of 2025-26: 1.2%Period 7 of 2025-26: 1.3%Period 8 of 2025-26: 1.7%Period 9 of 2025-26: 3.6%Period 10 of 2025-26: 2.3%Period 11 of 2025-26: 3.4%Period 12 of 2025-26: 2.7%Period 13 of 2025-26: 2.2%Period 1 of 2026-27: 4.2%Period 2 of 2026-27: 3.4%Period 3 of 2026-27: 2.6%Period 4 of 2026-27: 2.1%Period 5 of 2026-27: 4.1%Period 6 of 2026-27: 3.6%Period 7 of 2026-27: 1.3%2023-242024-252025-262026-27

Least punctual stations

StationScheduled stopsWithin 3 minCancelled
Haymarket3,41751.2%1.3%
Inverkeithing2,62655.4%1.6%
Leuchars (For St. Andrews)2,62661.0%1.6%
Kirkcaldy2,56861.6%1.7%
York37,29661.6%2.7%
Grantham28,12362.1%3.0%

Most punctual stations

StationScheduled stopsWithin 3 minCancelled
Lincoln4,20389.5%5.9%
Bradford Forster Square4,79988.3%5.8%
Harrogate4,11987.5%6.1%
Shipley (Yorks)4,78481.7%5.7%
Dunbar3,29775.9%1.4%
London Kings Cross62,89675.6%3.2%

Busiest stations

StationScheduled stopsWithin 3 minCancelled
London Kings Cross62,89675.6%3.2%
Doncaster42,06566.0%2.8%
York37,29661.6%2.7%
Peterborough36,46365.9%2.8%
Newcastle33,56963.7%2.3%
Newark Northgate29,53365.8%2.9%

Where it runs

AreaShare of stopsWithin 3 minCancelled
Yorkshire and The Humber32%67.1%3.4%
North East19%65.0%2.0%
East Midlands14%66.5%3.2%
London12%75.6%3.2%
East of England12%65.9%3.0%
Scotland11%67.4%1.8%

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2739,01267.5%1.3%
Period 6 of 2026-2739,33364.3%3.6%
Period 5 of 2026-2739,82562.8%4.1%
Period 4 of 2026-2739,98864.7%2.1%
Period 3 of 2026-2738,92965.0%2.6%
Period 2 of 2026-2739,22866.1%3.4%
Period 1 of 2026-2745,60566.4%4.2%
Period 13 of 2025-2640,42972.7%2.2%
Period 12 of 2025-2636,61271.1%2.7%
Period 11 of 2025-2637,82269.4%3.4%
Period 10 of 2025-2634,59368.1%2.3%
Period 9 of 2025-2634,68568.7%3.6%
Period 8 of 2025-2635,18672.6%1.7%

Time of year

60%70%80%90%P1: 73.5%1P2: 72.6%2P3: 72.1%3P4: 71.8%4P5: 69.7%5P6: 72.0%6P7: 71.0%7P8: 69.2%8P9: 65.1%9P10: 67.7%10P11: 70.2%11P12: 72.1%12P13: 75.3%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out