Pewsey
PEWSouth WestManaged by Great Western Railway
How this station is performing
Pewsey had 7,141 scheduled stops to Period 7 of 2026-27, about 20 a day. 49.1% of recorded arrivals were within three minutes of the timetable and 4.6% of scheduled stops were cancelled.
Pewsey opened on 11 November 1862, 164 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Pewsey is the newest; the oldest, Hungerford, opened in 1847.
Pewsey is remote: its nearest neighbours are Bedwyn (12.6 km east), Hungerford (19.7 km north-east), Grateley (21.8 km south-east), Kintbury (23.6 km east) and Andover (24.2 km south-east). At 49.1%, Pewsey is less punctual than all of them; the best of the five, Grateley, manages 81.8%.
Pewsey takes its name from a Village called Pewsey, home to about 3,790 people, and the station stands 0.5 km from its centre.
Pewsey has slipped sharply. 49.1% of stops came within three minutes of the timetable in the latest 13 periods, 5.5 percentage points worse than the 54.6% recorded in the 13 before. Cancellations held steady at 4.6% of scheduled stops, against 4.5% before.
Compared with 3 stations of a similar size in South West, Pewsey is the least punctual, at 49.1%. All of them are ahead, including Quintrell Downs (79.1%), Newquay (85.3%) and Looe (96.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 7,141 | 49.1% | 4.6% |
Operators with their own page for this station are linked to it.
Late train at Pewsey? Delay Repay
These operators call at Pewsey and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 421 | 55.8% | 4.8% |
| Period 6 of 2026-27 | 570 | 37.8% | 3.5% |
| Period 5 of 2026-27 | 561 | 37.2% | 6.1% |
| Period 4 of 2026-27 | 568 | 47.6% | 5.6% |
| Period 3 of 2026-27 | 510 | 45.1% | 5.7% |
| Period 2 of 2026-27 | 554 | 56.4% | 3.6% |
| Period 1 of 2026-27 | 602 | 58.9% | 3.0% |
| Period 13 of 2025-26 | 626 | 63.7% | 4.6% |
| Period 12 of 2025-26 | 567 | 67.0% | 1.2% |
| Period 11 of 2025-26 | 569 | 58.2% | 8.4% |
| Period 10 of 2025-26 | 447 | 41.5% | 4.5% |
| Period 9 of 2025-26 | 573 | 29.9% | 4.7% |
| Period 8 of 2025-26 | 573 | 37.2% | 4.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Quintrell Downs | 6,972 | 79.1% | 8.5% |
| Newquay | 7,479 | 85.3% | 8.9% |
| Looe | 6,638 | 96.4% | 4.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out