Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Period 3 of 2024-25

Previous periodNext periodAll periods

On time, nationally86.5%A year earlier: 84.9%
Cancelled, nationally3.2%A year earlier: 3.3%
Scheduled stops6,970,333Across Great Britain

How the period went

In Period 3 of 2024-25, 6,970,333 scheduled station stops were recorded across Great Britain. 86.5% of recorded arrivals came within three minutes of the timetable and 3.2% of scheduled stops were cancelled.

Compared with Period 2 of 2024-25, the biggest rises among stations with at least 1,500 scheduled stops were at Gloucester (up 7.2 points to 76.8%), Sydenham Hill (up 6.1 points to 90.7%), Avonmouth (up 6.0 points to 77.7%), Belvedere (up 6.0 points to 95.1%) and Brixton (up 6.0 points to 90.7%).

Compared with Period 2 of 2024-25, the biggest falls were at Southampton Central (down 14.4 points to 69.2%), Radyr (down 13.2 points to 78.0%), Cardiff Bay (down 12.8 points to 86.4%), Hamworthy (down 11.0 points to 70.2%) and Heath High Level (down 10.9 points to 77.4%).

Against the same period a year earlier, Period 3 of 2024-25 brought the biggest improvements at Shotton (up 26.0 points to 79.4%), Wrexham General (up 25.1 points to 82.3%), Pembrey and Burry Port (up 20.7 points to 80.0%) and Hereford (up 17.9 points to 76.3%).

Against the same period a year earlier, Period 3 of 2024-25 brought the biggest drops at Elstree and Borehamwood (down 14.0 points to 69.2%), Radlett (down 13.8 points to 70.4%), Mill Hill Broadway (down 13.6 points to 69.4%) and Cardiff Bay (down 10.8 points to 86.4%).

18 stations had their best figure on record in Period 3 of 2024-25; the busiest of them were Orpington (89.5%), London Cannon Street (92.4%), Manor Park (94.9%), Barnehurst (91.4%) and Deptford (92.3%).

Least punctual stations

StationScheduled stopsWithin 3 minCancelled
Crianlarich50247.9%0.4%
Honiton1,05149.2%2.5%
Penrith (North Lakes)1,66349.4%7.3%
Axminster1,05151.0%2.4%
Lockerbie1,02952.1%5.5%
Yeovil Junction1,34053.7%2.0%
Pershore1,01554.9%4.4%
Moreton-in-Marsh1,10956.7%4.8%

Most cancellations

StationScheduled stopsWithin 3 minCancelled
Whitchurch (Cardiff)1,22262.7%16.2%
Rhiwbina1,22267.6%15.5%
Birchgrove1,22267.2%14.7%
Ashton-under-Lyne80084.0%13.8%
Bedford St Johns80084.0%13.0%
Aspley Guise80090.2%12.8%
Bow Brickhill80090.4%12.8%
Fenny Stratford80090.8%12.8%

Operators

OperatorWithin 3 minCancelled
Greater Anglia94.8%1.1%
c2c94.2%1.3%
London Overground93.1%2.9%
Elizabeth line92.7%3.6%
Chiltern Railways92.0%1.2%
Heathrow Express91.2%1.9%
Merseyrail91.2%2.2%
ScotRail90.8%1.5%
Southeastern88.8%1.4%
South Western Railway86.8%1.8%
GTR85.1%4.8%
West Midlands Railway83.2%4.5%
Northern81.3%5.5%
Great Western Railway80.6%3.7%
Transport for Wales80.1%3.7%
East Midlands Railway76.1%2.2%
LNER75.9%3.3%
TransPennine Express73.3%2.1%
CrossCountry73.1%4.7%
Avanti56.6%8.4%

Areas

AreaWithin 3 minCancelled
London90.9%2.9%
Scotland90.4%1.5%
East of England89.0%3.4%
South East84.9%2.9%
North West83.3%4.2%
North East82.5%3.7%
West Midlands81.4%3.7%
Wales79.8%4.2%
East Midlands79.7%2.8%
Yorkshire and The Humber78.7%4.6%
South West78.1%4.0%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out