Period 3 of 2024-25
Previous periodNext periodAll periods
How the period went
In Period 3 of 2024-25, 6,970,333 scheduled station stops were recorded across Great Britain. 86.5% of recorded arrivals came within three minutes of the timetable and 3.2% of scheduled stops were cancelled.
Compared with Period 2 of 2024-25, the biggest rises among stations with at least 1,500 scheduled stops were at Gloucester (up 7.2 points to 76.8%), Sydenham Hill (up 6.1 points to 90.7%), Avonmouth (up 6.0 points to 77.7%), Belvedere (up 6.0 points to 95.1%) and Brixton (up 6.0 points to 90.7%).
Compared with Period 2 of 2024-25, the biggest falls were at Southampton Central (down 14.4 points to 69.2%), Radyr (down 13.2 points to 78.0%), Cardiff Bay (down 12.8 points to 86.4%), Hamworthy (down 11.0 points to 70.2%) and Heath High Level (down 10.9 points to 77.4%).
Against the same period a year earlier, Period 3 of 2024-25 brought the biggest improvements at Shotton (up 26.0 points to 79.4%), Wrexham General (up 25.1 points to 82.3%), Pembrey and Burry Port (up 20.7 points to 80.0%) and Hereford (up 17.9 points to 76.3%).
Against the same period a year earlier, Period 3 of 2024-25 brought the biggest drops at Elstree and Borehamwood (down 14.0 points to 69.2%), Radlett (down 13.8 points to 70.4%), Mill Hill Broadway (down 13.6 points to 69.4%) and Cardiff Bay (down 10.8 points to 86.4%).
18 stations had their best figure on record in Period 3 of 2024-25; the busiest of them were Orpington (89.5%), London Cannon Street (92.4%), Manor Park (94.9%), Barnehurst (91.4%) and Deptford (92.3%).
Least punctual stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Crianlarich | 502 | 47.9% | 0.4% |
| Honiton | 1,051 | 49.2% | 2.5% |
| Penrith (North Lakes) | 1,663 | 49.4% | 7.3% |
| Axminster | 1,051 | 51.0% | 2.4% |
| Lockerbie | 1,029 | 52.1% | 5.5% |
| Yeovil Junction | 1,340 | 53.7% | 2.0% |
| Pershore | 1,015 | 54.9% | 4.4% |
| Moreton-in-Marsh | 1,109 | 56.7% | 4.8% |
Most cancellations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Whitchurch (Cardiff) | 1,222 | 62.7% | 16.2% |
| Rhiwbina | 1,222 | 67.6% | 15.5% |
| Birchgrove | 1,222 | 67.2% | 14.7% |
| Ashton-under-Lyne | 800 | 84.0% | 13.8% |
| Bedford St Johns | 800 | 84.0% | 13.0% |
| Aspley Guise | 800 | 90.2% | 12.8% |
| Bow Brickhill | 800 | 90.4% | 12.8% |
| Fenny Stratford | 800 | 90.8% | 12.8% |
Operators
| Operator | Within 3 min | Cancelled |
|---|---|---|
| Greater Anglia | 94.8% | 1.1% |
| c2c | 94.2% | 1.3% |
| London Overground | 93.1% | 2.9% |
| Elizabeth line | 92.7% | 3.6% |
| Chiltern Railways | 92.0% | 1.2% |
| Heathrow Express | 91.2% | 1.9% |
| Merseyrail | 91.2% | 2.2% |
| ScotRail | 90.8% | 1.5% |
| Southeastern | 88.8% | 1.4% |
| South Western Railway | 86.8% | 1.8% |
| GTR | 85.1% | 4.8% |
| West Midlands Railway | 83.2% | 4.5% |
| Northern | 81.3% | 5.5% |
| Great Western Railway | 80.6% | 3.7% |
| Transport for Wales | 80.1% | 3.7% |
| East Midlands Railway | 76.1% | 2.2% |
| LNER | 75.9% | 3.3% |
| TransPennine Express | 73.3% | 2.1% |
| CrossCountry | 73.1% | 4.7% |
| Avanti | 56.6% | 8.4% |
Areas
| Area | Within 3 min | Cancelled |
|---|---|---|
| London | 90.9% | 2.9% |
| Scotland | 90.4% | 1.5% |
| East of England | 89.0% | 3.4% |
| South East | 84.9% | 2.9% |
| North West | 83.3% | 4.2% |
| North East | 82.5% | 3.7% |
| West Midlands | 81.4% | 3.7% |
| Wales | 79.8% | 4.2% |
| East Midlands | 79.7% | 2.8% |
| Yorkshire and The Humber | 78.7% | 4.6% |
| South West | 78.1% | 4.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out