Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Southeastern delays and reliability

On time, last 13 periods84.2%Great Britain: 83.6%
Cancelled1.7%Great Britain: 3.2%
Stations184With records
Punctuality rank10th of 23Among ranked operators

How this operator is doing

Southeastern had 7,636,082 scheduled station stops across 184 stations in the 13 four-week periods to Period 7 of 2026-27. 84.2% of the stops with a recorded arrival came within three minutes of the timetable, and 1.7% of scheduled stops were cancelled.

The oldest stations Southeastern calls at are Deptford (1836), London Bridge (1836) and Greenwich (1838), and the newest are Thanet Parkway (2023), Stratford International (2009) and Ebbsfleet International (2009).

Southeastern's northernmost stations are Stratford International and London St Pancras International and its southernmost are West St Leonards and St Leonards Warrior Square.

The most isolated stations on the Southeastern network are Charing (Kent) (6.5 km from Lenham), Pluckley (6.5 km from Charing (Kent)) and Sandwich (6.5 km from Deal).

Experience varies widely across the 173 ranked stations of Southeastern. The best-served tenth reach 93.7% or more, the median is 82.8% and the worst tenth manage 74.6% or less, a spread of 19.1 percentage points. 103 stations fall below 85%.

Across the whole run of data, the weakest four-week period for Southeastern was Period 9 of 2024-25, at 73.5%, some time before the latest year. The strongest was Period 2 of 2023-24, at 89.8%, and the two are 16.3 percentage points apart.

Delay Repay

Southeastern pays Delay Repay for a delay of 15 minutes or more, starting at 25% of a single ticket. The page sets the rules beside how often its trains run late. Read the Southeastern Delay Repay rules

Period by period

70%80%90%2023-242024-252025-262026-27Period 1 of 2023-24: 89.8%Period 2 of 2023-24: 89.8%Period 3 of 2023-24: 86.0%Period 4 of 2023-24: 87.9%Period 5 of 2023-24: 89.0%Period 6 of 2023-24: 87.4%Period 7 of 2023-24: 84.8%Period 8 of 2023-24: 83.6%Period 9 of 2023-24: 80.5%Period 10 of 2023-24: 80.6%Period 11 of 2023-24: 83.0%Period 12 of 2023-24: 86.4%Period 13 of 2023-24: 88.5%Period 1 of 2024-25: 88.4%Period 2 of 2024-25: 88.7%Period 3 of 2024-25: 88.8%Period 4 of 2024-25: 86.2%Period 5 of 2024-25: 86.8%Period 6 of 2024-25: 87.1%Period 7 of 2024-25: 83.4%Period 8 of 2024-25: 80.7%Period 9 of 2024-25: 73.5%Period 10 of 2024-25: 81.3%Period 11 of 2024-25: 81.5%Period 12 of 2024-25: 85.1%Period 13 of 2024-25: 86.4%Period 1 of 2025-26: 88.7%Period 2 of 2025-26: 85.4%Period 3 of 2025-26: 88.6%Period 4 of 2025-26: 85.5%Period 5 of 2025-26: 86.7%Period 6 of 2025-26: 86.8%Period 7 of 2025-26: 83.8%Period 8 of 2025-26: 81.9%Period 9 of 2025-26: 80.8%Period 10 of 2025-26: 84.6%Period 11 of 2025-26: 86.5%Period 12 of 2025-26: 87.0%Period 13 of 2025-26: 87.6%Period 1 of 2026-27: 89.1%Period 2 of 2026-27: 84.5%Period 3 of 2026-27: 82.4%Period 4 of 2026-27: 86.1%Period 5 of 2026-27: 82.1%Period 6 of 2026-27: 79.5%Period 7 of 2026-27: 80.8%
This pageGreat Britain
0%2%4%Period 1 of 2023-24: 0.8%Period 2 of 2023-24: 1.2%Period 3 of 2023-24: 1.8%Period 4 of 2023-24: 1.3%Period 5 of 2023-24: 1.5%Period 6 of 2023-24: 1.1%Period 7 of 2023-24: 1.6%Period 8 of 2023-24: 1.9%Period 9 of 2023-24: 1.5%Period 10 of 2023-24: 3.7%Period 11 of 2023-24: 1.4%Period 12 of 2023-24: 2.1%Period 13 of 2023-24: 1.0%Period 1 of 2024-25: 1.1%Period 2 of 2024-25: 1.1%Period 3 of 2024-25: 1.4%Period 4 of 2024-25: 1.8%Period 5 of 2024-25: 1.7%Period 6 of 2024-25: 1.8%Period 7 of 2024-25: 2.0%Period 8 of 2024-25: 2.0%Period 9 of 2024-25: 2.8%Period 10 of 2024-25: 3.1%Period 11 of 2024-25: 2.0%Period 12 of 2024-25: 1.5%Period 13 of 2024-25: 1.9%Period 1 of 2025-26: 1.2%Period 2 of 2025-26: 2.1%Period 3 of 2025-26: 1.5%Period 4 of 2025-26: 2.4%Period 5 of 2025-26: 1.9%Period 6 of 2025-26: 2.0%Period 7 of 2025-26: 1.9%Period 8 of 2025-26: 1.5%Period 9 of 2025-26: 1.5%Period 10 of 2025-26: 1.5%Period 11 of 2025-26: 1.3%Period 12 of 2025-26: 1.2%Period 13 of 2025-26: 1.5%Period 1 of 2026-27: 1.2%Period 2 of 2026-27: 2.5%Period 3 of 2026-27: 2.8%Period 4 of 2026-27: 1.6%Period 5 of 2026-27: 2.1%Period 6 of 2026-27: 1.6%Period 7 of 2026-27: 1.3%2023-242024-252025-262026-27

Least punctual stations

StationScheduled stopsWithin 3 minCancelled
Teynham16,72367.8%1.6%
Newington16,83869.0%1.7%
Hildenborough22,22370.3%2.1%
Faversham56,89670.7%1.2%
Stonegate16,80570.9%1.8%
Canterbury East17,20971.1%1.3%

Most punctual stations

StationScheduled stopsWithin 3 minCancelled
Sundridge Park25,24599.4%0.5%
Bromley North25,31399.2%0.5%
Yalding22,70395.3%1.9%
Maidstone Barracks23,76795.2%1.6%
New Hythe23,76695.2%1.6%
Wateringbury22,70395.1%1.8%

Busiest stations

StationScheduled stopsWithin 3 minCancelled
London Bridge331,88282.8%1.6%
London Charing Cross201,82584.9%2.4%
London Waterloo East201,78685.8%2.4%
Lewisham167,78487.0%1.5%
London Victoria133,31982.1%1.4%
Orpington125,30080.1%1.7%

Where it runs

AreaShare of stopsWithin 3 minCancelled
London60%86.9%1.7%
South East40%79.8%1.6%

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-27584,90780.8%1.3%
Period 6 of 2026-27589,05479.5%1.6%
Period 5 of 2026-27556,41382.1%2.1%
Period 4 of 2026-27597,71386.1%1.6%
Period 3 of 2026-27593,80682.4%2.8%
Period 2 of 2026-27569,51284.5%2.5%
Period 1 of 2026-27671,10489.1%1.2%
Period 13 of 2025-26648,03087.6%1.5%
Period 12 of 2025-26589,28787.0%1.2%
Period 11 of 2025-26585,10686.5%1.3%
Period 10 of 2025-26484,28184.6%1.5%
Period 9 of 2025-26584,79880.8%1.5%
Period 8 of 2025-26582,07181.9%1.5%

Time of year

75%80%85%90%P1: 89.0%1P2: 87.0%2P3: 86.5%3P4: 86.4%4P5: 86.2%5P6: 85.1%6P7: 83.2%7P8: 82.1%8P9: 78.3%9P10: 82.1%10P11: 83.7%11P12: 86.2%12P13: 87.5%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out