Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Four-week periods

The national picture in every four-week period, from the oldest to the newest.

What the periods show

Great Britain's railways are measured in 46 four-week periods in the data, from Period 1 of 2023-24 to Period 7 of 2026-27. The most punctual was Period 1 of 2023-24, when 88.2% of stops arrived within three minutes of the timetable, and the least punctual was Period 9 of 2024-25, at 77.4%.

Cancellations were highest in Period 9 of 2024-25, at 5.3% of scheduled stops, and lowest in Period 2 of 2023-24, at 2.3%.

In 3 of the 46 periods, fewer than 80% of recorded stops arrived within three minutes of the timetable.

Averaged across every railway year, period 9 (late November and December) is the hardest time of year for punctuality at 78.2%, and period 1 (April) is the easiest at 87.6%.

Each four-week period belongs to a railway year that starts in April. The newest period's figures are provisional and can be revised in a later release.

Punctuality in every period

75%80%85%90%2023-242024-252025-262026-27Period 1 of 2023-24: 88.2%Period 2 of 2023-24: 87.7%Period 3 of 2023-24: 84.9%Period 4 of 2023-24: 86.6%Period 5 of 2023-24: 87.1%Period 6 of 2023-24: 86.3%Period 7 of 2023-24: 84.4%Period 8 of 2023-24: 81.3%Period 9 of 2023-24: 78.3%Period 10 of 2023-24: 82.6%Period 11 of 2023-24: 84.7%Period 12 of 2023-24: 86.2%Period 13 of 2023-24: 87.4%Period 1 of 2024-25: 87.7%Period 2 of 2024-25: 87.1%Period 3 of 2024-25: 86.5%Period 4 of 2024-25: 85.2%Period 5 of 2024-25: 85.2%Period 6 of 2024-25: 85.7%Period 7 of 2024-25: 83.5%Period 8 of 2024-25: 81.7%Period 9 of 2024-25: 77.4%Period 10 of 2024-25: 83.8%Period 11 of 2024-25: 83.9%Period 12 of 2024-25: 86.2%Period 13 of 2024-25: 87.8%Period 1 of 2025-26: 87.6%Period 2 of 2025-26: 86.0%Period 3 of 2025-26: 86.1%Period 4 of 2025-26: 83.9%Period 5 of 2025-26: 85.4%Period 6 of 2025-26: 85.1%Period 7 of 2025-26: 84.0%Period 8 of 2025-26: 81.4%Period 9 of 2025-26: 78.9%Period 10 of 2025-26: 83.8%Period 11 of 2025-26: 85.7%Period 12 of 2025-26: 86.5%Period 13 of 2025-26: 87.2%Period 1 of 2026-27: 87.0%Period 2 of 2026-27: 84.3%Period 3 of 2026-27: 83.6%Period 4 of 2026-27: 82.5%Period 5 of 2026-27: 81.6%Period 6 of 2026-27: 81.1%Period 7 of 2026-27: 82.1%
This page

Every period

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-277,175,56782.1%2.6%
Period 6 of 2026-277,108,91181.1%3.5%
Period 5 of 2026-277,039,50781.6%4.6%
Period 4 of 2026-277,146,50882.5%4.0%
Period 3 of 2026-277,008,40483.6%3.6%
Period 2 of 2026-277,086,43084.3%3.7%
Period 1 of 2026-278,215,77087.0%2.6%
Period 13 of 2025-267,691,30687.2%2.3%
Period 12 of 2025-267,078,32786.5%2.4%
Period 11 of 2025-267,084,65485.7%2.9%
Period 10 of 2025-266,288,15783.8%3.3%
Period 9 of 2025-267,089,20478.9%3.7%
Period 8 of 2025-267,069,30681.4%3.0%
Period 7 of 2025-267,057,92584.0%3.0%
Period 6 of 2025-267,052,77585.1%2.8%
Period 5 of 2025-267,062,57985.4%3.4%
Period 4 of 2025-267,170,55683.9%3.5%
Period 3 of 2025-267,072,69686.1%2.8%
Period 2 of 2025-267,028,43486.0%2.4%
Period 1 of 2025-266,544,44287.6%2.4%
Period 13 of 2024-257,475,71787.8%2.4%
Period 12 of 2024-257,002,88386.2%2.6%
Period 11 of 2024-256,907,52383.9%3.5%
Period 10 of 2024-256,244,21283.8%4.4%
Period 9 of 2024-257,017,89677.4%5.3%
Period 8 of 2024-256,953,35481.7%3.7%
Period 7 of 2024-256,850,59183.5%3.9%
Period 6 of 2024-256,828,28985.7%3.4%
Period 5 of 2024-256,867,77585.2%3.4%
Period 4 of 2024-256,945,18085.2%3.6%
Period 3 of 2024-256,970,33386.5%3.2%
Period 2 of 2024-256,675,06087.1%2.7%
Period 1 of 2024-256,487,39287.7%2.7%
Period 13 of 2023-246,943,81687.4%2.4%
Period 12 of 2023-246,656,93986.2%2.6%
Period 11 of 2023-246,498,05984.7%2.7%
Period 10 of 2023-246,159,86882.6%4.8%
Period 9 of 2023-246,495,54578.3%4.1%
Period 8 of 2023-246,790,18781.3%3.9%
Period 7 of 2023-246,398,50484.4%3.0%
Period 6 of 2023-246,404,76686.3%2.7%
Period 5 of 2023-246,425,30687.1%3.2%
Period 4 of 2023-246,389,86586.6%2.7%
Period 3 of 2023-246,382,57084.9%3.3%
Period 2 of 2023-246,397,54487.7%2.3%
Period 1 of 2023-246,928,53388.2%2.6%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out