Moreton-in-Marsh
MIMSouth WestManaged by Great Western Railway
How this station is performing
Moreton-in-Marsh had 14,688 scheduled stops to Period 7 of 2026-27, about 40 a day. 56.4% of recorded arrivals were within three minutes of the timetable and 4.3% of scheduled stops were cancelled.
Moreton-in-Marsh opened on 4 June 1853, 173 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Moreton-in-Marsh is the oldest; the next oldest, Honeybourne, dates from 1853.
Moreton-in-Marsh is remote: its nearest neighbours are Kingham (11.1 km south-east), Honeybourne (15.2 km north-west), Shipton (15.9 km south-east), Ascott-under-Wychwood (16.7 km south-east) and Charlbury (19.6 km south-east). At 56.4%, Moreton-in-Marsh is less punctual than all of them; the best of the five, Charlbury, manages 60.9%.
Moreton-in-Marsh takes its name from a town called Moreton-in-Marsh, home to about 5,010 people, and the station stands 0.5 km from its centre.
Moreton-in-Marsh has slipped sharply. 56.4% of stops came within three minutes of the timetable in the latest 13 periods, 9.9 percentage points worse than the 66.3% recorded in the 13 before. Cancellations held steady at 4.3% of scheduled stops, against 4.5% before.
Compared with 3 stations of a similar size in South West, Moreton-in-Marsh is the least punctual, at 56.4%. All of them are ahead, including Lydney (68.1%), Tisbury (65.6%) and Severn Beach (79.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 14,688 | 56.4% | 4.3% |
Operators with their own page for this station are linked to it.
Late train at Moreton-in-Marsh? Delay Repay
These operators call at Moreton-in-Marsh and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,113 | 58.8% | 3.5% |
| Period 6 of 2026-27 | 1,128 | 47.8% | 5.5% |
| Period 5 of 2026-27 | 1,115 | 51.4% | 8.9% |
| Period 4 of 2026-27 | 1,116 | 51.6% | 6.1% |
| Period 3 of 2026-27 | 1,122 | 58.3% | 6.1% |
| Period 2 of 2026-27 | 1,116 | 63.6% | 3.1% |
| Period 1 of 2026-27 | 1,281 | 63.1% | 3.9% |
| Period 13 of 2025-26 | 1,241 | 72.0% | 2.0% |
| Period 12 of 2025-26 | 1,091 | 72.6% | 2.3% |
| Period 11 of 2025-26 | 1,120 | 65.4% | 2.3% |
| Period 10 of 2025-26 | 1,019 | 45.3% | 5.4% |
| Period 9 of 2025-26 | 1,116 | 34.4% | 3.1% |
| Period 8 of 2025-26 | 1,110 | 44.3% | 4.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Lydney | 14,789 | 68.1% | 6.5% |
| Tisbury | 14,551 | 65.6% | 3.2% |
| Severn Beach | 14,546 | 79.1% | 4.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out