Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Merseyrail delays and reliability

On time, last 13 periods91.5%Great Britain: 83.6%
Cancelled2.0%Great Britain: 3.2%
Stations69With records
Punctuality rank1st of 23Among ranked operators

How this operator is doing

Merseyrail had 4,031,710 scheduled station stops across 69 stations in the 13 four-week periods to Period 7 of 2026-27. 91.5% of the stops with a recorded arrival came within three minutes of the timetable, and 2.0% of scheduled stops were cancelled.

Merseyrail is the most punctual of the 23 ranked operators, at 91.5% within three minutes of the timetable. That is 7.9 percentage points above the national 83.6%, and well clear of Avanti, which is last on 55.2%.

The oldest stations Merseyrail calls at are Liverpool Lime Street (1836), Bebington (1840) and Hooton (1840), and the newest are Headbolt Lane (2023), Maghull North (2018) and Conway Park (1998).

Merseyrail's northernmost stations are Southport and Birkdale and its southernmost are Chester and Bache.

The most isolated stations on the Merseyrail network are Hightown (3.1 km from Hall Road), Capenhurst (2.8 km from Little Sutton) and Ainsdale (2.5 km from Hillside).

Stations of Merseyrail differ noticeably. Across 62 ranked stations the median is 92.2%, the best tenth reach 95.5% or more and the worst tenth 87.8% or less, a spread of 7.7 percentage points. 0 stations fall below 85%.

The stations where Merseyrail is least punctual, among those with enough traffic, are Birkenhead Central (85.8%), Moreton (Merseyside) (87.0%), Capenhurst (87.2%) and Rock Ferry (87.3%).

Delay Repay

Merseyrail pays Delay Repay for a delay of more than 30 minutes, starting at 100% of a single ticket. The page sets the rules beside how often its trains run late. Read the Merseyrail Delay Repay rules

Period by period

80%90%100%2023-242024-252025-262026-27Period 1 of 2023-24: 93.8%Period 2 of 2023-24: 93.4%Period 3 of 2023-24: 93.3%Period 4 of 2023-24: 93.8%Period 5 of 2023-24: 92.2%Period 6 of 2023-24: 92.2%Period 7 of 2023-24: 90.5%Period 8 of 2023-24: 92.1%Period 9 of 2023-24: 89.4%Period 10 of 2023-24: 89.9%Period 11 of 2023-24: 89.4%Period 12 of 2023-24: 88.6%Period 13 of 2023-24: 91.2%Period 1 of 2024-25: 91.8%Period 2 of 2024-25: 90.1%Period 3 of 2024-25: 91.2%Period 4 of 2024-25: 90.3%Period 5 of 2024-25: 89.0%Period 6 of 2024-25: 92.5%Period 7 of 2024-25: 93.6%Period 8 of 2024-25: 90.3%Period 9 of 2024-25: 89.3%Period 10 of 2024-25: 92.2%Period 11 of 2024-25: 89.2%Period 12 of 2024-25: 90.5%Period 13 of 2024-25: 91.3%Period 1 of 2025-26: 89.7%Period 2 of 2025-26: 89.8%Period 3 of 2025-26: 90.6%Period 4 of 2025-26: 91.1%Period 5 of 2025-26: 90.2%Period 6 of 2025-26: 91.2%Period 7 of 2025-26: 91.6%Period 8 of 2025-26: 90.5%Period 9 of 2025-26: 89.5%Period 10 of 2025-26: 91.6%Period 11 of 2025-26: 90.9%Period 12 of 2025-26: 90.4%Period 13 of 2025-26: 92.0%Period 1 of 2026-27: 91.5%Period 2 of 2026-27: 92.5%Period 3 of 2026-27: 92.0%Period 4 of 2026-27: 89.7%Period 5 of 2026-27: 91.3%Period 6 of 2026-27: 92.8%Period 7 of 2026-27: 94.1%
This pageGreat Britain
0%2%4%6%Period 1 of 2023-24: 1.1%Period 2 of 2023-24: 1.4%Period 3 of 2023-24: 1.4%Period 4 of 2023-24: 1.0%Period 5 of 2023-24: 1.5%Period 6 of 2023-24: 2.4%Period 7 of 2023-24: 2.5%Period 8 of 2023-24: 2.7%Period 9 of 2023-24: 2.8%Period 10 of 2023-24: 3.9%Period 11 of 2023-24: 3.6%Period 12 of 2023-24: 2.5%Period 13 of 2023-24: 2.2%Period 1 of 2024-25: 2.4%Period 2 of 2024-25: 2.9%Period 3 of 2024-25: 2.2%Period 4 of 2024-25: 2.6%Period 5 of 2024-25: 3.0%Period 6 of 2024-25: 2.1%Period 7 of 2024-25: 1.8%Period 8 of 2024-25: 2.9%Period 9 of 2024-25: 3.5%Period 10 of 2024-25: 2.4%Period 11 of 2024-25: 5.6%Period 12 of 2024-25: 2.4%Period 13 of 2024-25: 2.1%Period 1 of 2025-26: 1.8%Period 2 of 2025-26: 2.0%Period 3 of 2025-26: 2.0%Period 4 of 2025-26: 2.2%Period 5 of 2025-26: 2.2%Period 6 of 2025-26: 2.0%Period 7 of 2025-26: 2.6%Period 8 of 2025-26: 2.5%Period 9 of 2025-26: 1.8%Period 10 of 2025-26: 1.3%Period 11 of 2025-26: 2.5%Period 12 of 2025-26: 2.0%Period 13 of 2025-26: 1.6%Period 1 of 2026-27: 2.4%Period 2 of 2026-27: 1.3%Period 3 of 2026-27: 2.3%Period 4 of 2026-27: 1.8%Period 5 of 2026-27: 2.1%Period 6 of 2026-27: 2.4%Period 7 of 2026-27: 1.3%2023-242024-252025-262026-27

Least punctual stations

StationScheduled stopsWithin 3 minCancelled
Birkenhead Central67,31785.8%1.7%
Moreton (Merseyside)40,36387.0%1.7%
Capenhurst31,01387.2%2.6%
Rock Ferry67,31987.3%3.0%
Bache40,81187.6%2.9%
Fazakerley43,02487.6%1.8%

Most punctual stations

StationScheduled stopsWithin 3 minCancelled
Manor Road40,36398.4%1.7%
Aughton Park42,75396.4%1.8%
Maghull North42,75395.9%1.7%
New Brighton41,27095.6%1.5%
Southport49,20695.6%1.3%
St Michaels43,22395.6%1.9%

Busiest stations

StationScheduled stopsWithin 3 minCancelled
Liverpool Central211,83991.0%2.1%
Moorfields210,83992.6%2.0%
Birkenhead Hamilton Square149,19289.4%2.0%
Liverpool James Street149,19090.3%2.1%
Sandhills136,75795.0%1.8%
Kirkdale85,82691.2%1.7%

Where it runs

AreaShare of stopsWithin 3 minCancelled
North West100%91.5%2.0%

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-27304,07794.1%1.3%
Period 6 of 2026-27308,93692.8%2.4%
Period 5 of 2026-27309,71691.3%2.1%
Period 4 of 2026-27292,40189.7%1.8%
Period 3 of 2026-27306,53792.0%2.3%
Period 2 of 2026-27307,70292.5%1.3%
Period 1 of 2026-27353,44091.5%2.4%
Period 13 of 2025-26337,43692.0%1.6%
Period 12 of 2025-26307,42490.4%2.0%
Period 11 of 2025-26307,69190.9%2.5%
Period 10 of 2025-26279,33091.6%1.3%
Period 9 of 2025-26308,20589.5%1.8%
Period 8 of 2025-26308,81590.5%2.5%

Time of year

75%80%85%90%95%P1: 91.7%1P2: 91.4%2P3: 91.8%3P4: 91.2%4P5: 90.7%5P6: 92.2%6P7: 92.5%7P8: 90.9%8P9: 89.4%9P10: 91.3%10P11: 89.9%11P12: 89.9%12P13: 91.5%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out