Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Chiltern Railways delays and reliability

On time, last 13 periods87.7%Great Britain: 83.6%
Cancelled1.4%Great Britain: 3.2%
Stations64With records
Punctuality rank8th of 23Among ranked operators

How this operator is doing

Chiltern Railways had 1,034,043 scheduled station stops across 64 stations in the 13 four-week periods to Period 7 of 2026-27. 87.7% of the stops with a recorded arrival came within three minutes of the timetable, and 1.4% of scheduled stops were cancelled.

The oldest stations Chiltern Railways calls at are Oxford (1844), Banbury (1850) and Bicester Village (1850), and the newest are Oxford Parkway (2015), Stratford-upon-Avon Parkway (2013) and Aylesbury Vale Parkway (2008).

Chiltern Railways's northernmost stations are The Hawthorns and Smethwick Galton Bridge and its southernmost are London Marylebone and Wembley Stadium.

The most isolated stations on the Chiltern Railways network are Haddenham and Thame Parkway (8.7 km from Monks Risborough), Great Missenden (7.0 km from Wendover) and High Wycombe (6.3 km from Bourne End).

Chiltern Railways is among the most reliable operators at running its trains. 1.4% of scheduled stops were cancelled, which ranks 2nd lowest of 23, against a national median of 2.7% for stations.

Across the whole run of data, the weakest four-week period for Chiltern Railways was Period 1 of 2023-24, at 83.0%, some time before the latest year. The strongest was Period 1 of 2024-25, at 94.2%, and the two are 11.2 percentage points apart.

Delay Repay

Chiltern Railways pays Delay Repay for a delay of 15 minutes or more, starting at 25% of a single ticket. The page sets the rules beside how often its trains run late. Read the Chiltern Railways Delay Repay rules

Period by period

80%90%100%2023-242024-252025-262026-27Period 1 of 2023-24: 83.0%Period 2 of 2023-24: 89.0%Period 3 of 2023-24: 90.4%Period 4 of 2023-24: 92.5%Period 5 of 2023-24: 93.0%Period 6 of 2023-24: 91.7%Period 7 of 2023-24: 90.5%Period 8 of 2023-24: 90.4%Period 9 of 2023-24: 87.2%Period 10 of 2023-24: 90.0%Period 11 of 2023-24: 88.4%Period 12 of 2023-24: 89.9%Period 13 of 2023-24: 93.1%Period 1 of 2024-25: 94.2%Period 2 of 2024-25: 92.5%Period 3 of 2024-25: 92.0%Period 4 of 2024-25: 89.3%Period 5 of 2024-25: 89.2%Period 6 of 2024-25: 91.6%Period 7 of 2024-25: 85.6%Period 8 of 2024-25: 88.5%Period 9 of 2024-25: 85.7%Period 10 of 2024-25: 90.6%Period 11 of 2024-25: 91.9%Period 12 of 2024-25: 93.1%Period 13 of 2024-25: 93.3%Period 1 of 2025-26: 92.6%Period 2 of 2025-26: 89.8%Period 3 of 2025-26: 87.7%Period 4 of 2025-26: 87.4%Period 5 of 2025-26: 87.9%Period 6 of 2025-26: 89.0%Period 7 of 2025-26: 90.2%Period 8 of 2025-26: 86.9%Period 9 of 2025-26: 86.3%Period 10 of 2025-26: 88.9%Period 11 of 2025-26: 90.4%Period 12 of 2025-26: 91.8%Period 13 of 2025-26: 91.6%Period 1 of 2026-27: 91.5%Period 2 of 2026-27: 87.5%Period 3 of 2026-27: 85.9%Period 4 of 2026-27: 84.2%Period 5 of 2026-27: 84.3%Period 6 of 2026-27: 84.6%Period 7 of 2026-27: 85.5%
This pageGreat Britain
0%2%4%6%Period 1 of 2023-24: 2.6%Period 2 of 2023-24: 1.0%Period 3 of 2023-24: 0.8%Period 4 of 2023-24: 0.7%Period 5 of 2023-24: 1.5%Period 6 of 2023-24: 1.5%Period 7 of 2023-24: 2.3%Period 8 of 2023-24: 1.5%Period 9 of 2023-24: 1.4%Period 10 of 2023-24: 3.3%Period 11 of 2023-24: 3.0%Period 12 of 2023-24: 2.8%Period 13 of 2023-24: 1.4%Period 1 of 2024-25: 0.7%Period 2 of 2024-25: 1.2%Period 3 of 2024-25: 1.2%Period 4 of 2024-25: 1.2%Period 5 of 2024-25: 2.1%Period 6 of 2024-25: 1.7%Period 7 of 2024-25: 4.7%Period 8 of 2024-25: 1.9%Period 9 of 2024-25: 2.2%Period 10 of 2024-25: 3.0%Period 11 of 2024-25: 1.1%Period 12 of 2024-25: 1.9%Period 13 of 2024-25: 0.8%Period 1 of 2025-26: 0.9%Period 2 of 2025-26: 0.7%Period 3 of 2025-26: 1.8%Period 4 of 2025-26: 1.8%Period 5 of 2025-26: 1.5%Period 6 of 2025-26: 1.4%Period 7 of 2025-26: 1.2%Period 8 of 2025-26: 1.4%Period 9 of 2025-26: 2.5%Period 10 of 2025-26: 0.9%Period 11 of 2025-26: 1.3%Period 12 of 2025-26: 0.5%Period 13 of 2025-26: 1.7%Period 1 of 2026-27: 0.9%Period 2 of 2026-27: 1.2%Period 3 of 2026-27: 1.7%Period 4 of 2026-27: 1.5%Period 5 of 2026-27: 1.5%Period 6 of 2026-27: 1.7%Period 7 of 2026-27: 1.0%2023-242024-252025-262026-27

Least punctual stations

StationScheduled stopsWithin 3 minCancelled
Banbury25,05080.0%0.9%
Kings Sutton6,87980.3%0.9%
Bicester North23,34882.4%1.0%
Lapworth5,49982.4%1.3%
Warwick Parkway22,55782.7%1.1%
Dorridge24,18283.0%1.2%

Most punctual stations

StationScheduled stopsWithin 3 minCancelled
Little Kimble12,73394.5%1.0%
Monks Risborough12,73394.3%1.0%
Stratford-upon-Avon Parkway5,06892.7%1.2%
Bicester Village26,21992.6%1.1%
Islip7,81692.5%1.3%
Oxford26,52292.5%1.6%

Busiest stations

StationScheduled stopsWithin 3 minCancelled
London Marylebone91,13188.6%1.3%
High Wycombe58,90787.5%1.3%
Gerrards Cross42,68589.7%1.5%
Princes Risborough39,51389.2%1.1%
Beaconsfield38,51689.5%1.4%
Aylesbury35,09190.1%1.1%

Where it runs

AreaShare of stopsWithin 3 minCancelled
South East57%88.5%1.3%
West Midlands20%84.8%1.2%
London19%88.7%1.6%
East of England4%85.8%1.6%
East Midlands1%80.3%0.9%

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2780,52285.5%1.0%
Period 6 of 2026-2779,23484.6%1.7%
Period 5 of 2026-2780,90784.3%1.5%
Period 4 of 2026-2781,60484.2%1.5%
Period 3 of 2026-2773,86685.9%1.7%
Period 2 of 2026-2779,34887.5%1.2%
Period 1 of 2026-2788,45191.5%0.9%
Period 13 of 2025-2686,35691.6%1.7%
Period 12 of 2025-2678,91691.8%0.5%
Period 11 of 2025-2677,73390.4%1.3%
Period 10 of 2025-2668,88688.9%0.9%
Period 9 of 2025-2679,44486.3%2.5%
Period 8 of 2025-2678,77686.9%1.4%

Time of year

75%80%85%90%95%P1: 90.2%1P2: 89.6%2P3: 89.0%3P4: 88.1%4P5: 88.2%5P6: 89.1%6P7: 87.8%7P8: 88.6%8P9: 86.4%9P10: 89.8%10P11: 90.3%11P12: 91.6%12P13: 92.6%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out