Network Rail routes
Punctuality and cancellations for each of Network Rail's routes, newest 13 periods.
How routes compare
18 Network Rail routes are compared for the 13 four-week periods to Period 7 of 2026-27. Non-Network Rail Infrastructure (TfW Cardiff Valleys) is the most punctual at 93.3% within three minutes of the timetable and East Midlands the least at 76.8%, against 83.6% for Great Britain.
On cancellations, Non-Network Rail Infrastructure (The Chiltern Railway Co Ltd) cancels the least, at 1.5% of scheduled stops, and East Midlands the most, at 4.7%.
The busiest route is Anglia in the Eastern region, with 11,579,835 scheduled stops and 88.3% of them on time.
8 of the 18 routes beat the national figure for stops within three minutes, and the best and worst routes are 16.5 percentage points apart.
Route figures cover every operator calling at stations on the route. A route is a stretch of railway rather than a company, so one route can mix the records of several operators. Open a route page to see the stations on it ranked, the operators that call there and how the route has performed over recent four-week periods.
All routes
| Route | Region | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|---|
| Non-Network Rail Infrastructure (TfW Cardiff Valleys) | Non-Network Rail Infrastructure | 1,924,153 | 93.3% | 3.0% |
| Non-Network Rail Infrastructure (Private Railway) | Non-Network Rail Infrastructure | 4,458,781 | 92.2% | 3.5% |
| Anglia | Eastern | 11,579,835 | 88.3% | 3.5% |
| Scotland | Scotland | 9,721,850 | 87.5% | 1.7% |
| Non-Network Rail Infrastructure (The Chiltern Railway Co Ltd) | Non-Network Rail Infrastructure | 42,731 | 86.4% | 1.5% |
| Chiltern Rail Ltd | Non-Network Rail Infrastructure | 51,666 | 86.1% | 1.6% |
| Kent | Southern | 10,345,474 | 84.7% | 2.5% |
| Sussex | Southern | 8,097,399 | 83.7% | 4.2% |
| Wessex | Southern | 8,557,715 | 82.1% | 3.8% |
| Central | North West & Central | 4,927,223 | 81.7% | 3.2% |
| North West | North West & Central | 10,983,593 | 81.0% | 2.9% |
| East Coast | Eastern | 3,377,608 | 80.9% | 4.4% |
| High Speed | Southern | 148,727 | 79.6% | 1.8% |
| West Coast South | North West & Central | 2,570,789 | 79.1% | 4.6% |
| Wales | Wales & Western | 2,831,195 | 79.0% | 3.2% |
| North & East | Eastern | 5,249,226 | 77.9% | 2.5% |
| Western | Wales & Western | 5,317,606 | 77.4% | 4.0% |
| East Midlands | Eastern | 2,896,480 | 76.8% | 4.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out