Heathrow Express delays and reliability
How this operator is doing
Heathrow Express had 163,352 scheduled station stops across 6 stations in the 13 four-week periods to Period 7 of 2026-27. 89.5% of the stops with a recorded arrival came within three minutes of the timetable, and 3.9% of scheduled stops were cancelled.
The oldest stations Heathrow Express calls at are Ealing Broadway (1838), London Paddington (1838) and Hayes and Harlington (1864), and the newest are Heathrow Terminal 5 (Rail Station Only) (2008), Heathrow Terminals 2 and 3 (Rail Station Only) (1998) and Heathrow Terminal 4 (Rail Station Only) (1998).
Heathrow Express's northernmost stations are London Paddington and Ealing Broadway and its southernmost are Heathrow Terminal 4 (Rail Station Only) and Heathrow Terminals 2 and 3 (Rail Station Only).
The most isolated stations on the Heathrow Express network are Hayes and Harlington (2.9 km from Southall), Heathrow Terminal 5 (Rail Station Only) (2.3 km from Heathrow Terminals 2 and 3 (Rail Station Only)) and Heathrow Terminal 4 (Rail Station Only) (1.5 km from Heathrow Terminals 2 and 3 (Rail Station Only)).
Across the whole run of data, the weakest four-week period for Heathrow Express was Period 9 of 2023-24, at 75.0%, some time before the latest year. The strongest was Period 5 of 2025-26, at 93.3%, and the two are 18.3 percentage points apart. Cancellations peaked at 9.8% of scheduled stops in Period 9 of 2023-24, against 3.9% over the latest 13 periods.
Delay Repay
We could not read Heathrow Express's Delay Repay rules from a page we are allowed to fetch, so they are left out rather than guessed. Check the operator's own website before you claim.
Period by period
Least punctual stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Heathrow Terminals 2 and 3 (Rail Station Only) | 54,747 | 87.8% | 4.0% |
| London Paddington | 53,881 | 89.5% | 3.8% |
| Heathrow Terminal 5 (Rail Station Only) | 54,504 | 91.3% | 3.8% |
Most punctual stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Heathrow Terminal 5 (Rail Station Only) | 54,504 | 91.3% | 3.8% |
| London Paddington | 53,881 | 89.5% | 3.8% |
| Heathrow Terminals 2 and 3 (Rail Station Only) | 54,747 | 87.8% | 4.0% |
Busiest stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Heathrow Terminals 2 and 3 (Rail Station Only) | 54,747 | 87.8% | 4.0% |
| Heathrow Terminal 5 (Rail Station Only) | 54,504 | 91.3% | 3.8% |
| London Paddington | 53,881 | 89.5% | 3.8% |
| Heathrow Terminal 4 (Rail Station Only) | 218 | 96.0% | 7.8% |
| Hayes and Harlington | 1 | – | – |
| Ealing Broadway | 1 | – | – |
Where it runs
| Area | Share of stops | Within 3 min | Cancelled |
|---|---|---|---|
| London | 100% | 89.5% | 3.9% |
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 12,554 | 88.9% | 1.3% |
| Period 6 of 2026-27 | 11,228 | 82.6% | 5.3% |
| Period 5 of 2026-27 | 12,752 | 88.5% | 8.3% |
| Period 4 of 2026-27 | 12,649 | 89.0% | 1.4% |
| Period 3 of 2026-27 | 12,555 | 89.7% | 9.7% |
| Period 2 of 2026-27 | 12,641 | 90.4% | 3.5% |
| Period 1 of 2026-27 | 13,990 | 90.9% | 3.0% |
| Period 13 of 2025-26 | 13,628 | 92.8% | 1.7% |
| Period 12 of 2025-26 | 12,472 | 92.0% | 1.7% |
| Period 11 of 2025-26 | 12,397 | 91.1% | 5.2% |
| Period 10 of 2025-26 | 12,671 | 91.2% | 2.6% |
| Period 9 of 2025-26 | 11,595 | 88.4% | 4.3% |
| Period 8 of 2025-26 | 12,220 | 87.0% | 2.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out