Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Train punctuality in North East

On time, last 13 periods79.8%Great Britain: 83.6%
Cancelled2.7%Great Britain: 3.2%
Stations61In the data
Punctuality rank7th of 11Among areas

How this area is doing

North East has 61 stations in the data, with 1,270,120 scheduled stops in the 13 four-week periods to Period 7 of 2026-27. 79.8% of recorded arrivals came within three minutes of the timetable and 2.7% of scheduled stops were cancelled.

North East ranks 7th of 11 areas on 79.8%, in the weaker half, against 83.6% nationally (a difference of 3.8 percentage points). London leads on 87.6% and South West trails on 73.4%.

The least punctual stations in North East, among those with enough traffic, are Yarm (61.4%), Alnmouth (65.8%), Berwick-upon-Tweed (68.7%), Durham (69.0%) and Chester-le-Street (69.7%).

Across the whole run of data, the weakest four-week period for North East was Period 8 of 2023-24, at 68.6%, some time before the latest year. The strongest was Period 12 of 2025-26, at 84.1%, and the two are 15.5 percentage points apart. Cancellations peaked at 9.4% of scheduled stops in Period 7 of 2024-25, against 2.7% over the latest 13 periods.

The time of year matters a great deal for North East. Averaged over every railway year in the data, period 9 (late November and December) is the weakest at 71.8%, while period 13 (March) is the strongest at 83.4%, a spread of 11.6 percentage points.

Period by period

70%80%90%2023-242024-252025-262026-27Period 1 of 2023-24: 81.7%Period 2 of 2023-24: 80.8%Period 3 of 2023-24: 78.4%Period 4 of 2023-24: 80.1%Period 5 of 2023-24: 78.9%Period 6 of 2023-24: 79.2%Period 7 of 2023-24: 77.5%Period 8 of 2023-24: 68.6%Period 9 of 2023-24: 70.1%Period 10 of 2023-24: 76.0%Period 11 of 2023-24: 81.6%Period 12 of 2023-24: 83.2%Period 13 of 2023-24: 83.9%Period 1 of 2024-25: 83.0%Period 2 of 2024-25: 80.2%Period 3 of 2024-25: 82.5%Period 4 of 2024-25: 80.5%Period 5 of 2024-25: 79.7%Period 6 of 2024-25: 81.4%Period 7 of 2024-25: 77.0%Period 8 of 2024-25: 75.0%Period 9 of 2024-25: 72.3%Period 10 of 2024-25: 76.7%Period 11 of 2024-25: 79.3%Period 12 of 2024-25: 81.0%Period 13 of 2024-25: 83.5%Period 1 of 2025-26: 82.7%Period 2 of 2025-26: 79.6%Period 3 of 2025-26: 81.8%Period 4 of 2025-26: 80.3%Period 5 of 2025-26: 77.0%Period 6 of 2025-26: 80.1%Period 7 of 2025-26: 80.5%Period 8 of 2025-26: 75.0%Period 9 of 2025-26: 72.8%Period 10 of 2025-26: 76.2%Period 11 of 2025-26: 83.4%Period 12 of 2025-26: 84.1%Period 13 of 2025-26: 82.8%Period 1 of 2026-27: 78.9%Period 2 of 2026-27: 80.8%Period 3 of 2026-27: 83.1%Period 4 of 2026-27: 79.9%Period 5 of 2026-27: 78.0%Period 6 of 2026-27: 81.8%Period 7 of 2026-27: 79.1%
This pageGreat Britain
0%5%10%Period 1 of 2023-24: 3.8%Period 2 of 2023-24: 4.6%Period 3 of 2023-24: 5.0%Period 4 of 2023-24: 3.5%Period 5 of 2023-24: 5.0%Period 6 of 2023-24: 4.0%Period 7 of 2023-24: 3.2%Period 8 of 2023-24: 7.5%Period 9 of 2023-24: 5.1%Period 10 of 2023-24: 5.3%Period 11 of 2023-24: 3.5%Period 12 of 2023-24: 3.0%Period 13 of 2023-24: 2.8%Period 1 of 2024-25: 2.2%Period 2 of 2024-25: 4.3%Period 3 of 2024-25: 3.7%Period 4 of 2024-25: 5.5%Period 5 of 2024-25: 4.1%Period 6 of 2024-25: 4.8%Period 7 of 2024-25: 9.4%Period 8 of 2024-25: 6.3%Period 9 of 2024-25: 5.9%Period 10 of 2024-25: 6.2%Period 11 of 2024-25: 5.6%Period 12 of 2024-25: 2.9%Period 13 of 2024-25: 2.1%Period 1 of 2025-26: 2.8%Period 2 of 2025-26: 3.0%Period 3 of 2025-26: 2.0%Period 4 of 2025-26: 2.9%Period 5 of 2025-26: 4.2%Period 6 of 2025-26: 3.1%Period 7 of 2025-26: 2.6%Period 8 of 2025-26: 2.7%Period 9 of 2025-26: 2.7%Period 10 of 2025-26: 4.7%Period 11 of 2025-26: 2.7%Period 12 of 2025-26: 1.9%Period 13 of 2025-26: 2.5%Period 1 of 2026-27: 2.0%Period 2 of 2026-27: 3.0%Period 3 of 2026-27: 2.2%Period 4 of 2026-27: 2.8%Period 5 of 2026-27: 3.1%Period 6 of 2026-27: 3.0%Period 7 of 2026-27: 2.0%2023-242024-252025-262026-27

Least punctual stations

StationScheduled stopsWithin 3 minCancelled
Yarm12,10261.4%1.7%
Alnmouth19,63665.8%2.1%
Berwick-upon-Tweed23,68168.7%2.2%
Durham42,65169.0%3.1%
Chester-le-Street13,83169.7%3.1%
Morpeth29,04673.3%2.1%
Hartlepool24,52174.2%2.6%
Darlington75,79674.7%2.4%

Most punctual stations

StationScheduled stopsWithin 3 minCancelled
South Bank6,17394.5%2.1%
Marske22,34291.0%3.7%
Redcar East22,35390.0%3.7%
Saltburn23,99489.2%4.1%
Allens West23,16188.8%1.5%
North Road (Darlington)11,24788.8%2.1%
Longbeck22,35388.7%3.7%
Newton Aycliffe11,24788.0%2.1%

Busiest stations

StationScheduled stopsWithin 3 minCancelled
Newcastle145,10976.0%2.4%
Darlington75,79674.7%2.4%
Middlesbrough61,26383.1%3.0%
Thornaby55,83179.0%2.0%
Durham42,65169.0%3.1%
Eaglescliffe39,53677.4%1.7%
Redcar Central34,20183.4%5.6%
MetroCentre33,42984.9%3.3%

Operators in this area

OperatorShare of stopsWithin 3 minCancelled
Northern76%84.0%2.6%
TransPennine Express11%71.6%3.5%
LNER7%65.0%2.0%
CrossCountry5%65.2%3.6%
Grand Central1%62.6%2.1%
Lumo (East Coast)1%58.4%1.0%

Time of year

70%80%90%P1: 81.4%1P2: 80.3%2P3: 81.7%3P4: 80.2%4P5: 78.3%5P6: 80.7%6P7: 78.7%7P8: 73.0%8P9: 71.8%9P10: 76.3%10P11: 81.5%11P12: 82.8%12P13: 83.4%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out