Yeovil Junction had 17,042 scheduled stops to Period 7 of 2026-27, about 47 a day. 63.0% of recorded arrivals were within three minutes of the timetable and 2.8% of scheduled stops were cancelled.
Yeovil Junction opened on 19 July 1860, 166 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Yeovil Pen Mill is the oldest (1856) and Thornford the newest (1936), with Yeovil Junction in between.
The nearest stations to Yeovil Junction are Yeovil Pen Mill (2.2 km north), Thornford (2.8 km south-east), Yetminster (4.2 km south-east), Chetnole (7.1 km south-east) and Sherborne (7.3 km east). 5 stations lie within 10 km in all. At 63.0%, Yeovil Junction is less punctual than all of them; the best of the five, Yeovil Pen Mill, manages 70.8%.
Yeovil Junction is named after Yeovil, a market town, home to about 31,633 people, but the station stands 2.9 km from its centre.
Across the whole run of data, the weakest four-week period for Yeovil Junction was Period 8 of 2024-25, at 39.3%, some time before the latest year. The strongest was Period 7 of 2025-26, at 93.3%, and the two are 54.0 percentage points apart. Cancellations peaked at 13.6% of scheduled stops in Period 1 of 2023-24, against 2.8% over the latest 13 periods.
Compared with 3 stations of a similar size in South West, Yeovil Junction is the least punctual, at 63.0%. All of them are ahead, including Hayle (67.9%), Starcross (77.1%) and Weston Milton (72.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 17,042 | 63.0% | 2.8% |
Operators with their own page for this station are linked to it.
Late train at Yeovil Junction? Delay Repay
These operators call at Yeovil Junction and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,266 | 69.4% | 2.4% |
| Period 6 of 2026-27 | 1,192 | 71.5% | 1.3% |
| Period 5 of 2026-27 | 1,316 | 48.2% | 4.9% |
| Period 4 of 2026-27 | 1,299 | 42.5% | 3.4% |
| Period 3 of 2026-27 | 1,289 | 60.6% | 2.3% |
| Period 2 of 2026-27 | 1,319 | 54.1% | 3.6% |
| Period 1 of 2026-27 | 1,518 | 59.4% | 2.2% |
| Period 13 of 2025-26 | 1,488 | 64.6% | 1.7% |
| Period 12 of 2025-26 | 1,348 | 75.6% | 2.2% |
| Period 11 of 2025-26 | 1,271 | 54.9% | 3.5% |
| Period 10 of 2025-26 | 1,172 | 56.6% | 3.2% |
| Period 9 of 2025-26 | 1,297 | 75.5% | 2.3% |
| Period 8 of 2025-26 | 1,267 | 85.9% | 3.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Hayle | 16,910 | 67.9% | 7.0% |
| Starcross | 17,376 | 77.1% | 2.4% |
| Weston Milton | 17,423 | 72.7% | 3.5% |