Coryton
COYWalesManaged by TfW Rail
How this station is performing
Coryton had 21,673 scheduled stops to Period 7 of 2026-27, about 60 a day. 95.8% of recorded arrivals were within three minutes of the timetable and 3.5% of scheduled stops were cancelled.
Coryton opened on 1 March 1911. It was moved to the site it uses now on 20 July 1931. Among the 5 stations nearest to it with a known opening date, Llandaf is the oldest (1840) and Birchgrove the newest (1929), with Coryton in between.
The nearest stations to Coryton are Whitchurch (Cardiff) (0.6 km east), Rhiwbina (1.1 km east), Radyr (1.3 km west), Llandaf (1.3 km south) and Birchgrove (2.0 km east). 29 stations lie within 10 km in all. Of the five, Birchgrove is the most punctual at 96.2% and Radyr the least at 92.0%, with Coryton on 95.8%.
Coryton is one of 2 stations named after a suburb called Coryton; this one stands 0.4 km from its centre.
Coryton improved sharply over the past year. In the latest 13 periods 95.8% of stops came within three minutes of the timetable, up 6.8 percentage points from 89.0% in the 13 before. Cancellations fell to 3.5% of scheduled stops from 6.2%, which is 2.7 percentage points fewer.
2 of 3 stations of a similar size in Wales are more punctual than Coryton on 95.8%. The comparison group includes Merthyr Vale (96.0%), Pentre-Bach (97.2%) and Troed-y-rhiw (95.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 21,673 | 95.8% | 3.5% |
Operators with their own page for this station are linked to it.
Late train at Coryton? Delay Repay
These operators call at Coryton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,702 | 94.2% | 4.1% |
| Period 6 of 2026-27 | 1,693 | 94.6% | 3.8% |
| Period 5 of 2026-27 | 1,604 | 95.5% | 4.8% |
| Period 4 of 2026-27 | 1,633 | 94.4% | 4.1% |
| Period 3 of 2026-27 | 1,676 | 97.3% | 3.9% |
| Period 2 of 2026-27 | 1,578 | 96.8% | 5.4% |
| Period 1 of 2026-27 | 1,952 | 95.6% | 4.5% |
| Period 13 of 2025-26 | 1,830 | 97.8% | 0.7% |
| Period 12 of 2025-26 | 1,694 | 98.1% | 1.5% |
| Period 11 of 2025-26 | 1,657 | 97.8% | 2.7% |
| Period 10 of 2025-26 | 1,470 | 96.2% | 2.8% |
| Period 9 of 2025-26 | 1,592 | 92.2% | 4.6% |
| Period 8 of 2025-26 | 1,592 | 94.2% | 3.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Merthyr Vale | 21,675 | 96.0% | 1.8% |
| Pentre-Bach | 21,675 | 97.2% | 2.4% |
| Troed-y-rhiw | 21,675 | 95.2% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out