South Western Railway had 7,454,534 scheduled station stops across 204 stations in the 13 four-week periods to Period 7 of 2026-27. 82.6% of the stops with a recorded arrival came within three minutes of the timetable, and 3.5% of scheduled stops were cancelled.
The oldest stations South Western Railway calls at are Esher (1838), Farnborough (Main) (1838) and Surbiton (1838), and the newest are Cranbrook (Devon) (2015), Chandlers Ford (2003) and Smallbrook Junction (1991).
South Western Railway's northernmost stations are London Waterloo and Kew Bridge and its southernmost are Weymouth and Shanklin.
The most isolated stations on the South Western Railway network are Tisbury (13.9 km from Gillingham (Dorset)), Crewkerne (13.0 km from Yeovil Junction) and Axminster (12.9 km from Honiton).
Experience varies widely across the 204 ranked stations of South Western Railway. The best-served tenth reach 91.0% or more, the median is 83.2% and the worst tenth manage 70.5% or less, a spread of 20.5 percentage points. 118 stations fall below 85%.
Across the whole run of data, the weakest four-week period for South Western Railway was Period 9 of 2024-25, at 66.7%, some time before the latest year. The strongest was Period 2 of 2023-24, at 90.4%, and the two are 23.7 percentage points apart.
Delay Repay
South Western Railway pays Delay Repay for a delay of 15 minutes or more, starting at 25% of a single ticket. The page sets the rules beside how often its trains run late. Read the South Western Railway Delay Repay rules
Period by period
Least punctual stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Axminster | 11,114 | 59.1% | 1.9% |
| Honiton | 11,155 | 59.6% | 2.3% |
| Crewkerne | 10,966 | 60.8% | 1.9% |
| Gillingham (Dorset) | 15,009 | 62.7% | 3.1% |
| Yeovil Junction | 17,042 | 63.0% | 2.8% |
| Templecombe | 14,293 | 64.5% | 2.5% |
Most punctual stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Shanklin | 17,368 | 98.9% | 2.6% |
| Lake | 17,366 | 98.8% | 2.7% |
| Brading | 17,366 | 98.7% | 2.5% |
| Ryde St Johns Road | 18,038 | 98.7% | 2.6% |
| Ryde Esplanade | 16,505 | 98.5% | 3.0% |
| Sandown | 17,366 | 98.5% | 2.6% |
Busiest stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Waterloo | 426,216 | 82.0% | 2.5% |
| Clapham Junction | 372,346 | 82.5% | 4.3% |
| Vauxhall | 276,198 | 84.2% | 4.7% |
| Wimbledon | 180,379 | 83.6% | 5.1% |
| Woking | 158,414 | 73.7% | 2.7% |
| Earlsfield | 152,922 | 81.2% | 5.2% |
Where it runs
| Area | Share of stops | Within 3 min | Cancelled |
|---|---|---|---|
| South East | 50% | 82.1% | 2.9% |
| London | 42% | 85.3% | 4.0% |
| South West | 8% | 70.9% | 4.1% |
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 568,076 | 83.0% | 2.8% |
| Period 6 of 2026-27 | 571,160 | 83.9% | 2.3% |
| Period 5 of 2026-27 | 581,274 | 81.9% | 3.4% |
| Period 4 of 2026-27 | 580,268 | 81.9% | 3.0% |
| Period 3 of 2026-27 | 556,391 | 83.6% | 4.3% |
| Period 2 of 2026-27 | 571,012 | 80.2% | 6.5% |
| Period 1 of 2026-27 | 654,151 | 87.1% | 2.8% |
| Period 13 of 2025-26 | 612,584 | 87.7% | 2.0% |
| Period 12 of 2025-26 | 567,269 | 84.6% | 4.1% |
| Period 11 of 2025-26 | 572,366 | 84.5% | 2.6% |
| Period 10 of 2025-26 | 498,555 | 81.4% | 3.8% |
| Period 9 of 2025-26 | 563,274 | 75.3% | 3.0% |
| Period 8 of 2025-26 | 558,154 | 77.7% | 4.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out