West Midlands Railway delays and reliability
West Midlands Trains
How this operator is doing
West Midlands Railway had 4,807,457 scheduled station stops across 175 stations in the 13 four-week periods to Period 7 of 2026-27. 81.1% of the stops with a recorded arrival came within three minutes of the timetable, and 3.9% of scheduled stops were cancelled.
The oldest stations West Midlands Railway calls at are Liverpool Lime Street (1836), Acton Bridge (Cheshire) (1837) and Berkhamsted (1837), and the newest are Coventry Arena (2016), Bermuda Park (2016) and Stratford-upon-Avon Parkway (2013).
West Midlands Railway's northernmost stations are Liverpool Lime Street and Mossley Hill and its southernmost are London Euston and Wembley Central.
The most isolated stations on the West Midlands Railway network are Hereford (18.4 km from Leominster), Rugby (14.6 km from Long Buckby) and Long Buckby (13.8 km from Northampton).
Experience varies widely across the 169 ranked stations of West Midlands Railway. The best-served tenth reach 92.7% or more, the median is 83.9% and the worst tenth manage 69.9% or less, a spread of 22.8 percentage points. 99 stations fall below 85%.
The time of year matters a great deal for West Midlands Railway. Averaged over every railway year in the data, period 9 (late November and December) is the weakest at 74.4%, while period 13 (March) is the strongest at 86.4%, a spread of 12.0 percentage points.
Delay Repay
West Midlands Railway pays Delay Repay for a delay of 15 minutes or more, starting at 25% of a single ticket. The page sets the rules beside how often its trains run late. Read the West Midlands Railway Delay Repay rules
Period by period
Least punctual stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Tamworth | 12,280 | 43.1% | 6.2% |
| Atherstone | 12,252 | 51.4% | 6.5% |
| Penkridge | 20,158 | 57.1% | 3.3% |
| Stafford | 44,628 | 59.6% | 4.0% |
| Acton Bridge (Cheshire) | 12,512 | 61.3% | 4.4% |
| Longport | 12,082 | 61.8% | 4.1% |
Most punctual stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Stourbridge Town | 70,554 | 100.0% | 1.1% |
| Park Street | 13,363 | 96.6% | 6.3% |
| Garston (Hertfordshire) | 13,363 | 96.3% | 6.2% |
| How Wood (Hertfordshire) | 13,363 | 96.2% | 6.2% |
| St Albans Abbey | 13,579 | 95.7% | 6.3% |
| Watford North | 13,578 | 95.6% | 6.3% |
Busiest stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Birmingham New Street | 193,667 | 74.3% | 3.1% |
| Stourbridge Junction | 112,219 | 95.3% | 2.0% |
| Smethwick Galton Bridge | 89,435 | 80.1% | 3.6% |
| London Euston | 81,869 | 74.2% | 5.0% |
| Watford Junction | 73,558 | 79.1% | 5.9% |
| Aston | 70,655 | 84.6% | 2.5% |
Where it runs
| Area | Share of stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands | 78% | 82.1% | 3.3% |
| East of England | 11% | 82.3% | 6.4% |
| South East | 4% | 76.5% | 5.2% |
| North West | 4% | 67.8% | 4.5% |
| London | 3% | 76.0% | 5.7% |
| East Midlands | 1% | 71.1% | 4.4% |
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 376,768 | 79.3% | 2.9% |
| Period 6 of 2026-27 | 377,860 | 78.8% | 4.0% |
| Period 5 of 2026-27 | 351,925 | 79.5% | 5.4% |
| Period 4 of 2026-27 | 348,208 | 76.6% | 5.5% |
| Period 3 of 2026-27 | 353,121 | 81.4% | 3.4% |
| Period 2 of 2026-27 | 349,308 | 81.0% | 5.0% |
| Period 1 of 2026-27 | 423,268 | 84.6% | 2.8% |
| Period 13 of 2025-26 | 408,232 | 85.5% | 3.1% |
| Period 12 of 2025-26 | 373,970 | 85.8% | 2.3% |
| Period 11 of 2025-26 | 366,592 | 85.0% | 5.1% |
| Period 10 of 2025-26 | 333,795 | 82.2% | 3.4% |
| Period 9 of 2025-26 | 372,904 | 75.6% | 4.2% |
| Period 8 of 2025-26 | 371,506 | 78.3% | 3.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out