Ashchurch for Tewkesbury
ASCSouth WestManaged by Great Western Railway
How this station is performing
Ashchurch for Tewkesbury had 13,415 scheduled stops to Period 7 of 2026-27, about 37 a day. 61.1% of recorded arrivals were within three minutes of the timetable and 5.5% of scheduled stops were cancelled.
Ashchurch for Tewkesbury opened on 24 June 1840 and closed to passengers on 15 November 1971. It reopened on 1 June 1997, 29 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Ashchurch for Tewkesbury is the oldest; the next oldest, Cheltenham Spa, dates from 1840.
Ashchurch for Tewkesbury is remote: its nearest neighbours are Cheltenham Spa (11.4 km south), Pershore (14.9 km north), Evesham (15.6 km north-east), Gloucester (17.3 km south-west) and Worcestershire Parkway (17.8 km north). Of the five, Gloucester is the most punctual at 72.0% and Pershore the least at 57.8%, with Ashchurch for Tewkesbury on 61.1%.
Ashchurch for Tewkesbury is named after Tewkesbury, a town, home to about 10,704 people, but the station stands 2.4 km from its centre.
2 operators call at Ashchurch for Tewkesbury: Great Western Railway (62.5%, 79% of stops) and CrossCountry (55.8%, 21% of stops). The operator you travel with matters: Great Western Railway reaches 62.5% within three minutes while CrossCountry manages 55.8%, a gap of 6.7 percentage points.
Compared with 3 stations of a similar size in South West, Ashchurch for Tewkesbury is the least punctual, at 61.1%. All of them are ahead, including Stroud (Gloucs) (67.7%), Kemble (65.7%) and Stonehouse (73.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 10,562 | 62.5% | 4.5% |
| CrossCountry | 2,853 | 55.8% | 9.3% |
Operators with their own page for this station are linked to it.
Late train at Ashchurch for Tewkesbury? Delay Repay
These operators call at Ashchurch for Tewkesbury and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 905 | 52.2% | 4.6% |
| Period 6 of 2026-27 | 1,051 | 56.9% | 6.9% |
| Period 5 of 2026-27 | 1,021 | 55.1% | 9.3% |
| Period 4 of 2026-27 | 1,047 | 57.0% | 7.3% |
| Period 3 of 2026-27 | 1,021 | 61.4% | 8.1% |
| Period 2 of 2026-27 | 1,052 | 67.2% | 5.7% |
| Period 1 of 2026-27 | 1,216 | 66.2% | 1.5% |
| Period 13 of 2025-26 | 1,153 | 66.9% | 2.9% |
| Period 12 of 2025-26 | 1,052 | 71.6% | 2.9% |
| Period 11 of 2025-26 | 1,045 | 69.5% | 3.8% |
| Period 10 of 2025-26 | 933 | 64.3% | 8.4% |
| Period 9 of 2025-26 | 1,008 | 46.7% | 8.5% |
| Period 8 of 2025-26 | 911 | 53.9% | 3.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Stroud (Gloucs) | 13,409 | 67.7% | 3.4% |
| Kemble | 13,399 | 65.7% | 3.4% |
| Stonehouse | 13,336 | 73.0% | 3.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out