Train punctuality in Yorkshire and The Humber
How this area is doing
Yorkshire and The Humber has 187 stations in the data, with 4,772,677 scheduled stops in the 13 four-week periods to Period 7 of 2026-27. 76.7% of recorded arrivals came within three minutes of the timetable and 2.4% of scheduled stops were cancelled.
Yorkshire and The Humber ranks 9th of 11 areas on 76.7%, in the weaker half, against 83.6% nationally (a difference of 6.9 percentage points). London leads on 87.6% and South West trails on 73.4%.
The least punctual stations in Yorkshire and The Humber, among those with enough traffic, are Sowerby Bridge (58.6%), Mytholmroyd (59.5%), Hebden Bridge (60.2%), Todmorden (63.2%) and Slaithwaite (64.5%).
Across the whole run of data, the weakest four-week period for Yorkshire and The Humber was Period 9 of 2023-24, at 59.2%, some time before the latest year. The strongest was Period 13 of 2024-25, at 82.4%, and the two are 23.2 percentage points apart. Cancellations peaked at 8.0% of scheduled stops in Period 8 of 2023-24, against 2.4% over the latest 13 periods.
The time of year matters a great deal for Yorkshire and The Humber. Averaged over every railway year in the data, period 9 (late November and December) is the weakest at 63.1%, while period 13 (March) is the strongest at 81.5%, a spread of 18.4 percentage points.
Period by period
Least punctual stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Sowerby Bridge | 29,267 | 58.6% | 2.6% |
| Mytholmroyd | 26,206 | 59.5% | 2.6% |
| Hebden Bridge | 49,610 | 60.2% | 2.5% |
| Todmorden | 49,080 | 63.2% | 2.8% |
| Slaithwaite | 15,435 | 64.5% | 2.9% |
| Pontefract Baghill | 1,912 | 64.7% | 1.3% |
| South Milford | 12,624 | 64.9% | 2.5% |
| Huddersfield | 59,775 | 65.2% | 2.2% |
Most punctual stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bradford Forster Square | 60,778 | 92.9% | 1.7% |
| Ilkley | 42,737 | 92.0% | 1.3% |
| Baildon | 17,987 | 90.2% | 1.3% |
| Frizinghall | 55,979 | 90.2% | 1.3% |
| Guiseley | 42,743 | 90.1% | 1.3% |
| Apperley Bridge | 22,735 | 89.7% | 1.0% |
| Skipton | 55,440 | 89.6% | 1.2% |
| Steeton and Silsden | 44,690 | 89.5% | 1.3% |
Busiest stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Leeds | 369,384 | 76.8% | 2.4% |
| Sheffield | 182,746 | 69.1% | 3.4% |
| York | 167,340 | 70.4% | 2.4% |
| Doncaster | 130,522 | 73.6% | 2.8% |
| Meadowhall | 101,306 | 73.9% | 2.3% |
| Shipley (Yorks) | 96,388 | 86.9% | 1.5% |
| Wakefield Westgate | 79,855 | 66.0% | 4.2% |
| Hull | 72,948 | 78.3% | 2.5% |
Operators in this area
| Operator | Share of stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 81% | 78.6% | 2.3% |
| TransPennine Express | 10% | 70.6% | 2.2% |
| LNER | 3% | 67.1% | 3.4% |
| East Midlands Railway | 3% | 72.6% | 4.3% |
| CrossCountry | 1% | 56.1% | 4.2% |
| Grand Central | 1% | 61.3% | 2.2% |
| Hull Trains | 1% | 68.5% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out