London Overground delays and reliability
How this operator is doing
London Overground had 8,938,005 scheduled station stops across 114 stations in the 13 four-week periods to Period 7 of 2026-27. 89.4% of the stops with a recorded arrival came within three minutes of the timetable, and 4.9% of scheduled stops were cancelled.
The oldest stations London Overground calls at are London Bridge (1836), Harrow and Wealdstone (1837) and London Euston (1837), and the newest are Barking Riverside (2022), Hoxton (2010) and Imperial Wharf (2009).
London Overground's northernmost stations are Cheshunt and Theobalds Grove and its southernmost are West Croydon and Norwood Junction.
The most isolated stations on the London Overground network are Chingford (2.7 km from Highams Park), Highams Park (2.4 km from Wood Street) and Upminster (2.4 km from Emerson Park).
London Overground is among the least reliable operators at running its trains. 4.9% of scheduled stops were cancelled, which ranks 21st of 23 from the fewest, against a national median of 2.7% for stations.
Stations of London Overground differ noticeably. Across 111 ranked stations the median is 92.0%, the best tenth reach 94.6% or more and the worst tenth 81.2% or less, a spread of 13.4 percentage points. 14 stations fall below 85%.
For London Overground, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 86.3% of stops arrived within three minutes of the timetable. The strongest was Period 5 of 2023-24, at 94.4%, which is 8.1 percentage points higher. Cancellations peaked at 10.2% of scheduled stops in Period 5 of 2026-27, against 4.9% over the latest 13 periods.
Delay Repay
We could not read London Overground's Delay Repay rules from a page we are allowed to fetch, so they are left out rather than guessed. Check the operator's own website before you claim.
Period by period
Least punctual stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Finchley Road and Frognal | 101,753 | 75.2% | 8.2% |
| Hampstead Heath | 101,751 | 77.5% | 8.2% |
| Brondesbury | 101,752 | 77.8% | 7.9% |
| West Hampstead | 101,753 | 77.8% | 7.8% |
| Kensal Rise | 101,752 | 78.0% | 8.0% |
| Brondesbury Park | 101,753 | 78.3% | 7.9% |
Most punctual stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Romford | 22,220 | 99.7% | 0.4% |
| Upminster | 22,220 | 99.7% | 0.4% |
| Barking Riverside | 49,411 | 96.7% | 4.0% |
| Chingford | 52,192 | 96.4% | 1.6% |
| Enfield Town | 32,420 | 95.7% | 2.2% |
| Cheshunt | 26,054 | 95.6% | 2.4% |
Busiest stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Highbury and Islington | 215,851 | 89.5% | 6.3% |
| Canonbury | 215,814 | 86.0% | 6.9% |
| Dalston Junction | 209,638 | 92.0% | 4.1% |
| Haggerston | 209,634 | 91.4% | 3.9% |
| Hoxton | 209,634 | 91.9% | 3.9% |
| Rotherhithe | 209,634 | 91.1% | 3.7% |
Where it runs
| Area | Share of stops | Within 3 min | Cancelled |
|---|---|---|---|
| London | 97% | 89.4% | 5.0% |
| East of England | 3% | 89.5% | 3.1% |
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 691,965 | 88.7% | 3.5% |
| Period 6 of 2026-27 | 670,950 | 86.3% | 6.5% |
| Period 5 of 2026-27 | 685,820 | 88.8% | 10.2% |
| Period 4 of 2026-27 | 678,711 | 87.5% | 7.8% |
| Period 3 of 2026-27 | 675,043 | 88.9% | 4.4% |
| Period 2 of 2026-27 | 688,215 | 89.9% | 6.1% |
| Period 1 of 2026-27 | 792,951 | 91.3% | 3.5% |
| Period 13 of 2025-26 | 727,621 | 92.0% | 2.7% |
| Period 12 of 2025-26 | 684,372 | 91.0% | 3.6% |
| Period 11 of 2025-26 | 684,022 | 90.1% | 4.0% |
| Period 10 of 2025-26 | 597,108 | 90.8% | 3.8% |
| Period 9 of 2025-26 | 679,368 | 87.0% | 5.1% |
| Period 8 of 2025-26 | 681,859 | 89.0% | 3.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out