Elizabeth line delays and reliability
How this operator is doing
Elizabeth line had 4,436,200 scheduled station stops across 41 stations in the 13 four-week periods to Period 7 of 2026-27. 89.6% of the stops with a recorded arrival came within three minutes of the timetable, and 3.1% of scheduled stops were cancelled.
The oldest stations Elizabeth line calls at are Ealing Broadway (1838), Hanwell (1838) and London Paddington (1838), and the newest are Woolwich (2022), Tottenham Court Road (2022) and Canary Wharf (2022).
Elizabeth line's northernmost stations are Shenfield and Brentwood and its southernmost are Heathrow Terminal 4 (Rail Station Only) and Reading.
The most isolated stations on the Elizabeth line network are Slough (3.0 km from Windsor and Eton Riverside), Hayes and Harlington (2.9 km from Southall) and Brentwood (2.8 km from Shenfield).
Stations of Elizabeth line differ noticeably. Across 41 ranked stations the median is 88.3%, the best tenth reach 92.5% or more and the worst tenth 84.0% or less, a spread of 8.5 percentage points. 10 stations fall below 85%.
Across the whole run of data, the weakest four-week period for Elizabeth line was Period 9 of 2023-24, at 85.2%, some time before the latest year. The strongest was Period 3 of 2025-26, at 93.7%, and the two are 8.5 percentage points apart. Cancellations peaked at 7.9% of scheduled stops in Period 5 of 2023-24, against 3.1% over the latest 13 periods.
Delay Repay
We could not read Elizabeth line's Delay Repay rules from a page we are allowed to fetch, so they are left out rather than guessed. Check the operator's own website before you claim.
Period by period
Least punctual stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Twyford | 32,423 | 82.7% | 4.1% |
| Ealing Broadway | 130,211 | 82.9% | 4.3% |
| Taplow | 34,078 | 83.1% | 3.7% |
| Acton Main Line | 52,180 | 83.5% | 4.2% |
| Iver | 35,710 | 84.0% | 4.7% |
| Reading | 32,520 | 84.3% | 3.7% |
Most punctual stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Abbey Wood | 113,999 | 94.9% | 2.5% |
| Canary Wharf | 113,260 | 93.9% | 2.4% |
| Woolwich | 113,225 | 93.9% | 2.5% |
| Custom House | 113,265 | 93.8% | 2.5% |
| London Liverpool Street | 234,014 | 92.5% | 2.7% |
| Farringdon | 226,896 | 92.4% | 2.6% |
Busiest stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Paddington | 234,367 | 91.5% | 3.0% |
| London Liverpool Street | 234,014 | 92.5% | 2.7% |
| Tottenham Court Road | 226,897 | 92.1% | 2.6% |
| Bond Street | 226,896 | 92.2% | 2.6% |
| Farringdon | 226,896 | 92.4% | 2.6% |
| Whitechapel | 226,864 | 92.2% | 2.6% |
Where it runs
| Area | Share of stops | Within 3 min | Cancelled |
|---|---|---|---|
| London | 87% | 90.1% | 3.0% |
| South East | 8% | 84.4% | 4.1% |
| East of England | 5% | 88.3% | 3.0% |
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 344,132 | 90.5% | 2.5% |
| Period 6 of 2026-27 | 331,283 | 88.1% | 3.5% |
| Period 5 of 2026-27 | 345,067 | 86.6% | 6.2% |
| Period 4 of 2026-27 | 341,802 | 89.2% | 2.5% |
| Period 3 of 2026-27 | 335,992 | 88.0% | 3.5% |
| Period 2 of 2026-27 | 340,228 | 90.9% | 3.1% |
| Period 1 of 2026-27 | 389,610 | 90.9% | 3.1% |
| Period 13 of 2025-26 | 348,962 | 90.3% | 2.5% |
| Period 12 of 2025-26 | 342,225 | 91.7% | 1.5% |
| Period 11 of 2025-26 | 342,947 | 90.5% | 3.3% |
| Period 10 of 2025-26 | 307,856 | 91.6% | 2.3% |
| Period 9 of 2025-26 | 327,904 | 88.2% | 2.6% |
| Period 8 of 2025-26 | 338,192 | 88.0% | 3.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out