Blackpool North
BPNNorth WestManaged by Northern Trains
How this station is performing
Blackpool North had 49,656 scheduled stops to Period 7 of 2026-27, about 136 a day. 82.2% of recorded arrivals were within three minutes of the timetable and 4.2% of scheduled stops were cancelled.
Blackpool North opened on 29 April 1846, 180 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Poulton-le-Fylde is the oldest (1840) and Squires Gate the newest (1931), with Blackpool North in between.
The nearest stations to Blackpool North are Layton (Lancs) (1.8 km north-east), Blackpool South (2.7 km south), Blackpool Pleasure Beach (3.9 km south), Poulton-le-Fylde (4.7 km north-east) and Squires Gate (5.1 km south). 8 stations lie within 10 km in all. At 82.2%, Blackpool North is more punctual than every one of them; the best of the five, Poulton-le-Fylde, manages 80.7%.
Blackpool North is named after Blackpool, a town, home to about 139,305 people, but the station stands 0.7 km from its centre.
2 operators call at Blackpool North: Northern (82.3%, 98% of stops) and Avanti (79.7%, 2% of stops). They are close together, with Northern leading on 82.3% and Avanti trailing on 79.7%, a gap of 2.6 percentage points.
2 of 3 stations of a similar size in North West are more punctual than Blackpool North on 82.2%. The comparison group includes Warrington Central (66.6%), Hillside (91.2%) and Formby (93.4%).
Period by period
Operators calling here
Operators with their own page for this station are linked to it.
Late train at Blackpool North? Delay Repay
These operators call at Blackpool North and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,807 | 83.1% | 3.4% |
| Period 6 of 2026-27 | 3,815 | 85.6% | 3.3% |
| Period 5 of 2026-27 | 3,817 | 82.1% | 5.6% |
| Period 4 of 2026-27 | 3,817 | 81.3% | 3.9% |
| Period 3 of 2026-27 | 3,802 | 80.9% | 4.6% |
| Period 2 of 2026-27 | 3,828 | 82.4% | 3.6% |
| Period 1 of 2026-27 | 4,452 | 85.2% | 3.0% |
| Period 13 of 2025-26 | 4,190 | 83.6% | 7.0% |
| Period 12 of 2025-26 | 3,760 | 84.4% | 2.0% |
| Period 11 of 2025-26 | 3,723 | 86.4% | 3.1% |
| Period 10 of 2025-26 | 3,143 | 80.2% | 8.2% |
| Period 9 of 2025-26 | 3,762 | 73.7% | 4.7% |
| Period 8 of 2025-26 | 3,740 | 79.0% | 3.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Warrington Central | 49,194 | 66.6% | 4.6% |
| Hillside | 49,129 | 91.2% | 1.3% |
| Formby | 49,015 | 93.4% | 1.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out