Kew Gardens
KWGLondonManaged by London Underground
How this station is performing
Kew Gardens had 52,255 scheduled stops to Period 7 of 2026-27, about 144 a day. 85.0% of recorded arrivals were within three minutes of the timetable and 9.4% of scheduled stops were cancelled.
Kew Gardens opened on 1 January 1869, 157 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Mortlake is the oldest (1846) and North Sheen the newest (1930), with Kew Gardens in between.
The nearest stations to Kew Gardens are Chiswick (1.2 km east), Kew Bridge (1.3 km north), North Sheen (1.4 km south), Mortlake (1.6 km south-east) and Gunnersbury (1.7 km north-east). 73 stations lie within 10 km in all. Of the five, Kew Bridge is the most punctual at 89.8% and Gunnersbury the least at 84.8%, with Kew Gardens on 85.0%.
Kew Gardens is named after Kew, an area of London, but the station stands 0.9 km from its centre.
Cancellations are a particular problem at Kew Gardens. 9.4% of scheduled stops did not happen, 3.5 times the national median of 2.7%. Ranked from fewest cancellations to most, the station is 2361st of 2,374.
2 of 3 stations of a similar size in London are more punctual than Kew Gardens on 85.0%. The comparison group includes Gunnersbury (84.8%), Acton Central (85.8%) and Motspur Park (86.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 52,255 | 85.0% | 9.4% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,272 | 87.5% | 5.8% |
| Period 6 of 2026-27 | 4,131 | 83.3% | 10.8% |
| Period 5 of 2026-27 | 4,134 | 84.7% | 18.2% |
| Period 4 of 2026-27 | 4,253 | 81.2% | 16.2% |
| Period 3 of 2026-27 | 3,681 | 82.5% | 8.6% |
| Period 2 of 2026-27 | 4,243 | 84.9% | 11.7% |
| Period 1 of 2026-27 | 4,652 | 89.1% | 6.4% |
| Period 13 of 2025-26 | 4,592 | 88.7% | 4.4% |
| Period 12 of 2025-26 | 3,885 | 87.9% | 6.6% |
| Period 11 of 2025-26 | 3,803 | 85.1% | 8.5% |
| Period 10 of 2025-26 | 2,713 | 85.1% | 7.1% |
| Period 9 of 2025-26 | 3,805 | 79.6% | 11.8% |
| Period 8 of 2025-26 | 4,091 | 83.6% | 6.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Gunnersbury | 52,255 | 84.8% | 9.3% |
| Acton Central | 52,257 | 85.8% | 8.3% |
| Motspur Park | 52,278 | 86.1% | 3.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out