Ashton-under-Lyne
AHNNorth WestManaged by Northern Trains
How this station is performing
Ashton-under-Lyne had 11,543 scheduled stops to Period 7 of 2026-27, about 32 a day. 81.6% of recorded arrivals were within three minutes of the timetable and 3.4% of scheduled stops were cancelled.
Ashton-under-Lyne opened on 13 April 1846, 180 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Guide Bridge is the oldest (1841) and Flowery Field the newest (1985), with Ashton-under-Lyne in between.
The nearest stations to Ashton-under-Lyne are Stalybridge (2.1 km east), Guide Bridge (2.3 km south-west), Hyde North (3.0 km south), Flowery Field (3.4 km south) and Fairfield (4.1 km south-west). 33 stations lie within 10 km in all. Of the five, Hyde North is the most punctual at 91.6% and Stalybridge the least at 72.3%, with Ashton-under-Lyne on 81.6%.
Ashton-under-Lyne takes its name from a market town called Ashton-under-Lyne, home to about 45,198 people, and the station stands 0.5 km from its centre.
Across the whole run of data, the weakest four-week period for Ashton-under-Lyne was Period 9 of 2023-24, at 68.5%, some time before the latest year. The strongest was Period 13 of 2024-25, at 91.4%, and the two are 22.9 percentage points apart. Cancellations peaked at 13.8% of scheduled stops in Period 4 of 2024-25, against 3.4% over the latest 13 periods.
2 of 3 stations of a similar size in North West are more punctual than Ashton-under-Lyne on 81.6%. The comparison group includes Congleton (78.1%), Kendal (86.3%) and Windermere (85.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 11,543 | 81.6% | 3.4% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 908 | 80.9% | 1.4% |
| Period 6 of 2026-27 | 912 | 83.4% | 2.1% |
| Period 5 of 2026-27 | 722 | 85.9% | 6.9% |
| Period 4 of 2026-27 | 720 | 80.8% | 4.0% |
| Period 3 of 2026-27 | 906 | 82.9% | 4.0% |
| Period 2 of 2026-27 | 908 | 80.0% | 2.3% |
| Period 1 of 2026-27 | 1,060 | 81.5% | 1.3% |
| Period 13 of 2025-26 | 950 | 84.5% | 2.1% |
| Period 12 of 2025-26 | 908 | 84.5% | 1.8% |
| Period 11 of 2025-26 | 908 | 81.8% | 2.4% |
| Period 10 of 2025-26 | 826 | 81.0% | 9.6% |
| Period 9 of 2025-26 | 908 | 73.3% | 4.7% |
| Period 8 of 2025-26 | 907 | 80.3% | 4.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Congleton | 11,474 | 78.1% | 2.5% |
| Kendal | 11,636 | 86.3% | 2.3% |
| Windermere | 11,638 | 85.8% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out