Axminster
AXMSouth WestManaged by South Western Railway
How this station is performing
Axminster had 11,453 scheduled stops to Period 7 of 2026-27, about 32 a day. 58.8% of recorded arrivals were within three minutes of the timetable and 2.8% of scheduled stops were cancelled.
Axminster opened on 19 July 1860, 166 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Axminster is the newest; the oldest, Taunton, opened in 1842.
Axminster is remote: its nearest neighbours are Honiton (12.9 km west), Crewkerne (19.1 km north-east), Feniton (19.7 km west), Whimple (24.5 km west) and Taunton (28.0 km north). At 58.8%, Axminster is less punctual than all of them; the best of the five, Whimple, manages 70.2%.
Axminster takes its name from a market town called Axminster, home to about 5,761 people, and the station stands 0.6 km from its centre.
Axminster has slipped sharply. 58.8% of stops came within three minutes of the timetable in the latest 13 periods, 6.7 percentage points worse than the 65.5% recorded in the 13 before. Cancellations rose to 2.8% of scheduled stops from 2.3%, which is 0.5 percentage points more.
Compared with 3 stations of a similar size in South West, Axminster is the least punctual, at 58.8%. All of them are ahead, including Honiton (59.5%), Devonport (82.2%) and Cranbrook (Devon) (68.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 11,114 | 59.1% | 1.9% |
| Great Western Railway | 339 | – | – |
Operators with their own page for this station are linked to it.
Late train at Axminster? Delay Repay
These operators call at Axminster and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 566 | 63.9% | 3.5% |
| Period 6 of 2026-27 | 562 | 61.2% | 3.7% |
| Period 5 of 2026-27 | 822 | 37.2% | 4.9% |
| Period 4 of 2026-27 | 1,005 | 41.9% | 4.4% |
| Period 3 of 2026-27 | 1,027 | 60.1% | 2.5% |
| Period 2 of 2026-27 | 1,050 | 54.3% | 3.5% |
| Period 1 of 2026-27 | 1,059 | 56.1% | 1.8% |
| Period 13 of 2025-26 | 1,089 | 66.2% | 1.2% |
| Period 12 of 2025-26 | 1,048 | 76.0% | 2.6% |
| Period 11 of 2025-26 | 923 | 48.4% | 2.5% |
| Period 10 of 2025-26 | 960 | 61.7% | 2.7% |
| Period 9 of 2025-26 | 730 | 66.0% | 1.0% |
| Period 8 of 2025-26 | 612 | 78.3% | 3.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Honiton | 11,494 | 59.5% | 3.2% |
| Devonport | 11,120 | 82.2% | 4.1% |
| Cranbrook (Devon) | 11,111 | 68.8% | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out