Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Pershore

PSHWest MidlandsManaged by Great Western Railway

On time, last 13 periods57.8%Great Britain: 83.6%
Cancelled4.1%Great Britain: 3.2%
Stops a day37Scheduled, on average
Punctuality rank2352nd of 2,374Among ranked stations

How this station is performing

Pershore has usable figures for 11 of the last 13 four-week periods to Period 7 of 2026-27, covering 13,336 scheduled stops, about 37 a day. In those periods 57.8% of stops arrived within three minutes of the timetable and 4.1% of scheduled stops were cancelled.

Pershore opened on 3 May 1852, 174 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Ashchurch for Tewkesbury is the oldest (1840) and Worcestershire Parkway the newest (2020), with Pershore in between.

The nearest stations to Pershore are Worcestershire Parkway (6.6 km north-west), Evesham (9.2 km south-east), Worcester Shrub Hill (11.8 km north-west), Worcester Foregate Street (12.4 km north-west) and Ashchurch for Tewkesbury (14.9 km south). 2 stations lie within 10 km in all. At 57.8%, Pershore is less punctual than all of them; the best of the five, Worcester Foregate Street, manages 76.0%.

Pershore takes its name from a market town called Pershore, home to about 8,401 people, and the station stands 1.9 km from its centre.

Compared with 3 stations of a similar size in West Midlands, Pershore is the least punctual, at 57.8%. All of them are ahead, including Oakengates (76.5%), Honeybourne (59.6%) and Cosford (77.4%).

Period by period

40%60%80%2023-242024-252025-262026-27Period 1 of 2023-24: 66.5%Period 2 of 2023-24: 80.7%Period 3 of 2023-24: 65.4%Period 4 of 2023-24: 57.3%Period 5 of 2023-24: 62.9%Period 6 of 2023-24: 49.4%Period 7 of 2023-24: 58.7%Period 8 of 2023-24: 53.3%Period 9 of 2023-24: 50.4%Period 10 of 2023-24: 50.0%Period 11 of 2023-24: 59.6%Period 12 of 2023-24: 61.1%Period 13 of 2023-24: 61.2%Period 1 of 2024-25: 65.4%Period 2 of 2024-25: 57.1%Period 3 of 2024-25: 54.9%Period 4 of 2024-25: 55.3%Period 5 of 2024-25: 57.9%Period 6 of 2024-25: 51.6%Period 7 of 2024-25: 60.7%Period 8 of 2024-25: 59.7%Period 9 of 2024-25: 54.4%Period 10 of 2024-25: 65.6%Period 11 of 2024-25: 72.4%Period 12 of 2024-25: 71.8%Period 13 of 2024-25: 70.6%Period 1 of 2025-26: 74.6%Period 2 of 2025-26: 76.4%Period 3 of 2025-26: 66.1%Period 4 of 2025-26: 62.1%Period 5 of 2025-26: 64.2%Period 6 of 2025-26: 55.5%Period 7 of 2025-26: 52.0%Period 8 of 2025-26: 48.7%Period 10 of 2025-26: 42.5%Period 11 of 2025-26: 63.9%Period 13 of 2025-26: 70.6%Period 1 of 2026-27: 63.9%Period 2 of 2026-27: 61.9%Period 3 of 2026-27: 58.2%Period 4 of 2026-27: 54.2%Period 5 of 2026-27: 53.6%Period 6 of 2026-27: 51.1%Period 7 of 2026-27: 62.1%
This pageGreat Britain
0%5%10%Period 1 of 2023-24: 3.4%Period 2 of 2023-24: 2.4%Period 3 of 2023-24: 2.8%Period 4 of 2023-24: 2.9%Period 5 of 2023-24: 5.3%Period 6 of 2023-24: 3.7%Period 7 of 2023-24: 3.1%Period 8 of 2023-24: 4.3%Period 9 of 2023-24: 7.7%Period 10 of 2023-24: 6.8%Period 11 of 2023-24: 4.9%Period 12 of 2023-24: 5.0%Period 13 of 2023-24: 3.7%Period 1 of 2024-25: 3.8%Period 2 of 2024-25: 5.0%Period 3 of 2024-25: 4.4%Period 4 of 2024-25: 5.2%Period 5 of 2024-25: 5.2%Period 6 of 2024-25: 3.3%Period 7 of 2024-25: 3.4%Period 8 of 2024-25: 4.9%Period 9 of 2024-25: 8.0%Period 10 of 2024-25: 9.6%Period 11 of 2024-25: 3.1%Period 12 of 2024-25: 2.9%Period 13 of 2024-25: 3.4%Period 1 of 2025-26: 2.3%Period 2 of 2025-26: 1.9%Period 3 of 2025-26: 3.1%Period 4 of 2025-26: 2.8%Period 5 of 2025-26: 3.4%Period 6 of 2025-26: 6.4%Period 7 of 2025-26: 4.6%Period 8 of 2025-26: 4.5%Period 9 of 2025-26: 3.0%Period 10 of 2025-26: 5.1%Period 11 of 2025-26: 2.3%Period 12 of 2025-26: 1.7%Period 13 of 2025-26: 2.5%Period 1 of 2026-27: 3.5%Period 2 of 2026-27: 2.6%Period 3 of 2026-27: 6.0%Period 4 of 2026-27: 5.8%Period 5 of 2026-27: 7.7%Period 6 of 2026-27: 5.1%Period 7 of 2026-27: 3.2%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Great Western Railway13,33657.8%4.1%

Operators with their own page for this station are linked to it.

Late train at Pershore? Delay Repay

These operators call at Pershore and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,01662.1%3.2%
Period 6 of 2026-271,03251.1%5.1%
Period 5 of 2026-271,01953.6%7.7%
Period 4 of 2026-271,02054.2%5.8%
Period 3 of 2026-271,02758.2%6.0%
Period 2 of 2026-271,02061.9%2.6%
Period 1 of 2026-271,17163.9%3.5%
Period 13 of 2025-261,13570.6%2.5%
Period 12 of 2025-26957–1.7%
Period 11 of 2025-2697663.9%2.3%
Period 10 of 2025-2693742.5%5.1%
Period 9 of 2025-261,020–3.0%
Period 8 of 2025-261,00648.7%4.5%

Time of year

60%80%P1: 67.6%1P2: 68.9%2P3: 61.0%3P4: 57.3%4P5: 59.6%5P6: 51.8%6P7: 58.4%7P8: 54.5%8P9: 52.4%9P10: 52.5%10P11: 65.8%11P12: 66.7%12P13: 67.7%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in West Midlands

StationScheduled stopsWithin 3 minCancelled
Oakengates13,32976.5%3.9%
Honeybourne13,28359.6%4.3%
Cosford13,28177.4%3.9%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out