c2c delays and reliability
How this operator is doing
c2c had 1,576,309 scheduled station stops across 29 stations in the 13 four-week periods to Period 7 of 2026-27. 89.5% of the stops with a recorded arrival came within three minutes of the timetable, and 2.0% of scheduled stops were cancelled.
The oldest stations c2c calls at are Stratford (London) (1839), Limehouse (1840) and London Fenchurch Street (1841), and the newest are Chafford Hundred Lakeside (1995), Basildon (1974) and East Tilbury (1936).
c2c's northernmost stations are Basildon and West Horndon and its southernmost are Tilbury Town and Grays.
The most isolated stations on the c2c network are West Horndon (5.7 km from Brentwood), Benfleet (4.1 km from Pitsea) and Ockendon (4.0 km from Chafford Hundred Lakeside).
c2c has slipped a little, from 92.3% within three minutes in the previous 13 periods to 89.5% in the latest 13, a fall of 2.8 percentage points. Cancellations rose to 2.0% of scheduled stops from 1.3%, which is 0.7 percentage points more.
For c2c, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 76.9% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 96.0%, which is 19.1 percentage points higher. Cancellations peaked at 5.0% of scheduled stops in Period 6 of 2026-27, against 2.0% over the latest 13 periods.
Delay Repay
We could not read c2c's Delay Repay rules from a page we are allowed to fetch, so they are left out rather than guessed. Check the operator's own website before you claim.
Period by period
Least punctual stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Liverpool Street | 7,877 | 85.5% | 5.3% |
| Shoeburyness | 60,301 | 85.6% | 1.8% |
| Stratford (London) | 7,773 | 85.7% | 5.0% |
| Southend Central | 73,602 | 87.2% | 1.7% |
| Stanford-le-Hope | 31,521 | 87.3% | 2.8% |
| Westcliff | 73,131 | 87.3% | 1.8% |
Most punctual stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Dagenham Dock | 31,458 | 92.5% | 2.6% |
| Rainham (Essex) | 31,451 | 92.5% | 2.6% |
| Basildon | 52,596 | 92.3% | 1.9% |
| West Horndon | 32,665 | 92.1% | 1.7% |
| Laindon | 53,748 | 91.9% | 1.9% |
| Barking | 106,578 | 91.6% | 2.0% |
Busiest stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Barking | 106,578 | 91.6% | 2.0% |
| London Fenchurch Street | 106,123 | 88.3% | 1.8% |
| West Ham | 103,458 | 90.9% | 2.1% |
| Limehouse | 96,134 | 91.0% | 2.0% |
| Upminster | 80,425 | 90.8% | 2.0% |
| Leigh-on-Sea | 76,229 | 89.3% | 1.7% |
Where it runs
| Area | Share of stops | Within 3 min | Cancelled |
|---|---|---|---|
| East of England | 64% | 89.0% | 2.0% |
| London | 36% | 90.6% | 2.1% |
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 120,950 | 84.0% | 2.0% |
| Period 6 of 2026-27 | 100,580 | 76.9% | 5.0% |
| Period 5 of 2026-27 | 109,746 | 83.5% | 2.6% |
| Period 4 of 2026-27 | 125,164 | 90.3% | 3.5% |
| Period 3 of 2026-27 | 113,967 | 90.4% | 2.4% |
| Period 2 of 2026-27 | 123,414 | 92.5% | 2.8% |
| Period 1 of 2026-27 | 141,582 | 91.9% | 1.7% |
| Period 13 of 2025-26 | 138,733 | 94.1% | 1.0% |
| Period 12 of 2025-26 | 122,569 | 93.1% | 1.6% |
| Period 11 of 2025-26 | 123,274 | 92.8% | 0.8% |
| Period 10 of 2025-26 | 110,253 | 88.6% | 1.8% |
| Period 9 of 2025-26 | 121,924 | 91.4% | 0.8% |
| Period 8 of 2025-26 | 124,153 | 90.1% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out