Period 13 of 2024-25
Previous periodNext periodAll periods
How the period went
In Period 13 of 2024-25, 7,475,717 scheduled station stops were recorded across Great Britain. 87.8% of recorded arrivals came within three minutes of the timetable and 2.4% of scheduled stops were cancelled.
Compared with Period 12 of 2024-25, the biggest rises among stations with at least 1,500 scheduled stops were at Penrith (North Lakes) (up 14.0 points to 63.6%), Manchester Oxford Road (up 13.5 points to 73.7%), Deansgate (up 13.2 points to 77.0%), Royston (up 11.8 points to 82.7%) and East Didsbury (up 11.6 points to 81.4%).
Compared with Period 12 of 2024-25, the biggest falls were at Roydon (down 5.3 points to 87.6%), Sawbridgeworth (down 4.7 points to 88.4%), Ash (down 4.4 points to 88.4%), Harlow Mill (down 4.3 points to 89.2%) and Harlow Town (down 4.2 points to 86.5%).
Against the same period a year earlier, Period 13 of 2024-25 brought the biggest improvements at Arbroath (up 19.0 points to 80.4%), Leuchars (For St. Andrews) (up 16.6 points to 81.6%), Truro (up 15.2 points to 87.8%) and Severn Tunnel Junction (up 15.1 points to 75.8%).
Against the same period a year earlier, Period 13 of 2024-25 brought the biggest drops at Nunhead (down 10.0 points to 81.9%), Cardiff Bay (down 9.9 points to 89.2%), Greenhithe for Bluewater (down 9.1 points to 80.9%) and Eltham (down 8.5 points to 82.2%).
81 stations had their best figure on record in Period 13 of 2024-25; the busiest of them were London St Pancras International (83.2%), Birmingham New Street (80.3%), Edinburgh (91.3%), Haymarket (92.1%) and Sheffield (79.5%).
Least punctual stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Pewsey | 612 | 58.4% | 4.2% |
| Lockerbie | 1,120 | 61.1% | 1.8% |
| Briton Ferry | 721 | 63.4% | 1.4% |
| Baglan | 721 | 63.5% | 1.5% |
| Kidwelly | 819 | 63.6% | 1.5% |
| Penrith (North Lakes) | 1,858 | 63.6% | 1.5% |
| Skewen | 721 | 64.1% | 1.4% |
| Corkickle | 873 | 64.5% | 5.4% |
Most cancellations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Brent Cross West | 5,486 | 77.6% | 9.2% |
| Harpenden | 5,865 | 81.4% | 8.8% |
| Morden South | 1,865 | – | 8.7% |
| South Merton | 1,865 | 89.5% | 8.7% |
| St Helier (London) | 1,865 | – | 8.7% |
| Sutton Common | 1,865 | – | 8.7% |
| West Sutton | 1,865 | 89.6% | 8.7% |
| Wimbledon Chase | 1,865 | 89.1% | 8.7% |
Operators
| Operator | Within 3 min | Cancelled |
|---|---|---|
| Chiltern Railways | 93.3% | 0.8% |
| Greater Anglia | 92.9% | 1.6% |
| c2c | 92.9% | 1.9% |
| ScotRail | 92.1% | 1.4% |
| London Overground | 91.7% | 2.4% |
| Merseyrail | 91.3% | 2.1% |
| Elizabeth line | 90.4% | 2.0% |
| Heathrow Express | 89.0% | 4.1% |
| South Western Railway | 88.4% | 2.3% |
| GTR | 87.6% | 3.9% |
| West Midlands Railway | 87.6% | 2.2% |
| Southeastern | 86.4% | 1.9% |
| Northern | 84.9% | 2.3% |
| Transport for Wales | 84.2% | 2.6% |
| Great Western Railway | 82.5% | 3.0% |
| East Midlands Railway | 80.5% | 2.3% |
| LNER | 77.4% | 1.3% |
| CrossCountry | 77.0% | 3.4% |
| TransPennine Express | 74.8% | 1.4% |
| Avanti | 67.4% | 2.0% |
Areas
| Area | Within 3 min | Cancelled |
|---|---|---|
| Scotland | 91.9% | 1.4% |
| London | 89.9% | 2.7% |
| East of England | 89.6% | 2.4% |
| South East | 86.2% | 2.5% |
| West Midlands | 86.2% | 2.2% |
| North West | 86.1% | 2.4% |
| Wales | 83.8% | 2.8% |
| North East | 83.5% | 2.1% |
| South West | 83.1% | 2.7% |
| East Midlands | 82.5% | 2.1% |
| Yorkshire and The Humber | 82.4% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out