Baglan
BAJWalesManaged by TfW Rail
How this station is performing
Baglan had 8,752 scheduled stops to Period 7 of 2026-27, about 24 a day. 58.3% of recorded arrivals were within three minutes of the timetable and 2.7% of scheduled stops were cancelled.
Baglan opened on 2 June 1996, 30 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Baglan is the newest; the oldest, Port Talbot Parkway, opened in 1850.
The nearest stations to Baglan are Briton Ferry (2.7 km north), Port Talbot Parkway (3.1 km south-east), Neath (5.3 km north), Skewen (5.8 km north-west) and Llansamlet (7.4 km north-west). 6 stations lie within 10 km in all. At 58.3%, Baglan is less punctual than all of them; the best of the five, Port Talbot Parkway, manages 63.8%.
Baglan takes its name from a Village called Baglan, home to about 6,819 people, and the station stands 0.9 km from its centre.
For Baglan, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 43.8% of stops arrived within three minutes of the timetable. The strongest was Period 4 of 2024-25, at 75.5%, which is 31.7 percentage points higher. Cancellations peaked at 14.0% of scheduled stops in Period 3 of 2023-24, against 2.7% over the latest 13 periods.
2 of 3 stations of a similar size in Wales are more punctual than Baglan on 58.3%. The comparison group includes Briton Ferry (58.6%), Llansamlet (60.0%) and Skewen (58.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 8,752 | 58.3% | 2.7% |
Operators with their own page for this station are linked to it.
Late train at Baglan? Delay Repay
These operators call at Baglan and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 670 | 58.4% | 2.4% |
| Period 6 of 2026-27 | 683 | 57.7% | 2.5% |
| Period 5 of 2026-27 | 686 | 53.3% | 4.5% |
| Period 4 of 2026-27 | 692 | 56.4% | 5.5% |
| Period 3 of 2026-27 | 695 | 59.4% | 2.0% |
| Period 2 of 2026-27 | 685 | 60.0% | 2.5% |
| Period 1 of 2026-27 | 803 | 63.6% | 2.5% |
| Period 13 of 2025-26 | 753 | 67.7% | 1.3% |
| Period 12 of 2025-26 | 570 | 67.5% | 2.3% |
| Period 11 of 2025-26 | 486 | 67.2% | 2.7% |
| Period 10 of 2025-26 | 643 | 55.1% | 2.6% |
| Period 9 of 2025-26 | 695 | 43.8% | 3.0% |
| Period 8 of 2025-26 | 691 | 49.4% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Briton Ferry | 8,735 | 58.6% | 2.8% |
| Llansamlet | 8,714 | 60.0% | 2.7% |
| Skewen | 8,714 | 58.3% | 2.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out