Kidwelly has usable figures for 11 of the last 13 four-week periods to Period 7 of 2026-27, covering 12,546 scheduled stops, about 34 a day. In those periods 69.1% of stops arrived within three minutes of the timetable and 2.4% of scheduled stops were cancelled.
Kidwelly opened on 11 October 1852, 174 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Bynea is the oldest (1850) and Carmarthen the newest (1860), with Kidwelly in between.
The nearest stations to Kidwelly are Ferryside (5.2 km north-west), Pembrey and Burry Port (7.3 km south-east), Llanelli (12.7 km south-east), Carmarthen (13.2 km north) and Bynea (16.6 km south-east). 2 stations lie within 10 km in all. At 69.1%, Kidwelly is less punctual than all of them; the best of the five, Carmarthen, manages 74.8%.
Kidwelly takes its name from a town called Kidwelly, home to about 3,692 people, and the station stands 0.8 km from its centre.
Kidwelly improved sharply over the past year. In the latest 13 periods 69.1% of stops came within three minutes of the timetable, up 5.7 percentage points from 63.4% in the 13 before. Cancellations held steady at 2.4% of scheduled stops, against 2.7% before.
Compared with 3 stations of a similar size in Wales, Kidwelly is the least punctual, at 69.1%. All of them are ahead, including Ferryside (70.3%), Caldicot (70.8%) and Tir-Phil (88.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 11,924 | 68.4% | 2.3% |
| Great Western Railway | 622 | – | – |
Operators with their own page for this station are linked to it.
Late train at Kidwelly? Delay Repay
These operators call at Kidwelly and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 915 | 69.1% | 2.8% |
| Period 6 of 2026-27 | 1,018 | 67.1% | 0.8% |
| Period 5 of 2026-27 | 1,007 | 62.6% | 3.1% |
| Period 4 of 2026-27 | 998 | 63.3% | 3.6% |
| Period 3 of 2026-27 | 999 | 67.1% | 3.0% |
| Period 2 of 2026-27 | 966 | 69.6% | 2.4% |
| Period 1 of 2026-27 | 1,123 | 72.4% | 2.7% |
| Period 13 of 2025-26 | 1,061 | 76.9% | 1.4% |
| Period 12 of 2025-26 | 969 | 79.1% | 1.0% |
| Period 11 of 2025-26 | 936 | 80.6% | 1.9% |
| Period 10 of 2025-26 | 867 | – | 2.3% |
| Period 9 of 2025-26 | 945 | – | 3.4% |
| Period 8 of 2025-26 | 742 | 56.8% | 3.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out