Harpenden
HPDEast of EnglandManaged by Govia Thameslink Railway (Thameslink)
How this station is performing
Harpenden had 79,665 scheduled stops to Period 7 of 2026-27, about 219 a day. 80.1% of recorded arrivals were within three minutes of the timetable and 5.7% of scheduled stops were cancelled.
Harpenden opened on 13 July 1868, 158 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, St Albans Abbey is the oldest (1858) and Luton Airport Parkway the newest (1999), with Harpenden in between.
The nearest stations to Harpenden are Luton Airport Parkway (7.1 km north-west), St Albans City (7.3 km south), St Albans Abbey (7.8 km south), Luton (8.7 km north-west) and Park Street (9.9 km south). 5 stations lie within 10 km in all. Of the five, Park Street is the most punctual at 96.6% and St Albans City the least at 72.2%, with Harpenden on 80.1%.
Harpenden takes its name from a town called Harpenden, home to about 30,674 people, and the station stands 0.3 km from its centre.
Compared with 3 stations of a similar size in East of England, Harpenden is the least punctual, at 80.1%. All of them are ahead, including Broxbourne (88.0%), Harlow Town (87.6%) and Ipswich (91.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 79,665 | 80.1% | 5.7% |
Operators with their own page for this station are linked to it.
Late train at Harpenden? Delay Repay
These operators call at Harpenden and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 6,412 | 78.2% | 3.9% |
| Period 6 of 2026-27 | 6,139 | 75.5% | 6.8% |
| Period 5 of 2026-27 | 5,614 | 75.3% | 8.3% |
| Period 4 of 2026-27 | 6,041 | 75.4% | 7.2% |
| Period 3 of 2026-27 | 4,569 | 81.5% | 3.5% |
| Period 2 of 2026-27 | 5,764 | 84.0% | 3.7% |
| Period 1 of 2026-27 | 6,944 | 85.5% | 3.4% |
| Period 13 of 2025-26 | 7,037 | 82.6% | 3.1% |
| Period 12 of 2025-26 | 6,355 | 84.1% | 6.9% |
| Period 11 of 2025-26 | 6,392 | 80.0% | 6.2% |
| Period 10 of 2025-26 | 5,654 | 83.2% | 6.6% |
| Period 9 of 2025-26 | 6,431 | 75.6% | 9.5% |
| Period 8 of 2025-26 | 6,313 | 79.2% | 4.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Broxbourne | 79,029 | 88.0% | 2.5% |
| Harlow Town | 79,025 | 87.6% | 2.7% |
| Ipswich | 78,596 | 91.2% | 1.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out