How this station is performing
Brent Cross West had 71,106 scheduled stops to Period 7 of 2026-27, about 195 a day. 74.0% of recorded arrivals were within three minutes of the timetable and 7.1% of scheduled stops were cancelled.
Brent Cross West opened on 10 December 2023, 3 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Brent Cross West is the newest; the oldest, Brondesbury, opened in 1860.
The nearest stations to Brent Cross West are Cricklewood (1.5 km south-east), Hendon (1.5 km north-west), Brondesbury (3.1 km south-east), West Hampstead Thameslink (3.3 km south-east) and Brondesbury Park (3.3 km south). 72 stations lie within 10 km in all. Of the five, Brondesbury Park is the most punctual at 78.3% and Cricklewood the least at 72.3%, with Brent Cross West on 74.0%.
Brent Cross West is named after Brent Cross, an area of London, but the station stands 1.0 km from its centre.
Cancellations are a particular problem at Brent Cross West. 7.1% of scheduled stops did not happen, 2.6 times the national median of 2.7%. Ranked from fewest cancellations to most, the station is 2319th of 2,374.
Compared with 3 stations of a similar size in London, Brent Cross West is the least punctual, at 74.0%. All of them are ahead, including Thornton Heath (93.4%), Norbury (93.8%) and Streatham Common (93.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 71,106 | 74.0% | 7.1% |
Operators with their own page for this station are linked to it.
Late train at Brent Cross West? Delay Repay
These operators call at Brent Cross West and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,705 | 72.3% | 5.8% |
| Period 6 of 2026-27 | 5,462 | 67.4% | 7.9% |
| Period 5 of 2026-27 | 5,138 | 72.4% | 9.8% |
| Period 4 of 2026-27 | 5,530 | 72.4% | 5.1% |
| Period 3 of 2026-27 | 4,473 | 73.4% | 6.1% |
| Period 2 of 2026-27 | 5,151 | 75.6% | 4.7% |
| Period 1 of 2026-27 | 6,276 | 78.2% | 5.4% |
| Period 13 of 2025-26 | 6,230 | 78.7% | 5.2% |
| Period 12 of 2025-26 | 5,722 | 77.4% | 5.9% |
| Period 11 of 2025-26 | 5,753 | 70.9% | 8.7% |
| Period 10 of 2025-26 | 4,520 | 75.3% | 10.2% |
| Period 9 of 2025-26 | 5,527 | 71.4% | 11.7% |
| Period 8 of 2025-26 | 5,619 | 75.0% | 6.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Thornton Heath | 71,575 | 93.4% | 3.1% |
| Norbury | 71,640 | 93.8% | 3.1% |
| Streatham Common | 71,719 | 93.2% | 3.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out