Wimbledon Chase
WBOLondonManaged by Govia Thameslink Railway (Thameslink)
How this station is performing
Wimbledon Chase has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 23,713 scheduled stops, about 65 a day. In those periods 84.3% of stops arrived within three minutes of the timetable and 9.2% of scheduled stops were cancelled.
Wimbledon Chase opened on 7 July 1929, 97 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Wimbledon is the oldest (1838) and Morden South the newest (1930), with Wimbledon Chase in between.
The nearest stations to Wimbledon Chase are South Merton (1.0 km south-east), Raynes Park (1.1 km west), Wimbledon (1.5 km north-east), Morden South (1.9 km south-east) and Motspur Park (2.4 km south-west). 85 stations lie within 10 km in all. Of the five, Raynes Park is the most punctual at 86.4% and Wimbledon the least at 82.8%, with Wimbledon Chase on 84.3%.
Wimbledon Chase takes its name from an area of London called Wimbledon Chase, and the station stands 0.2 km from its centre.
1 of 3 stations of a similar size in London are more punctual than Wimbledon Chase on 84.3%. The comparison group includes South Merton (83.0%), West Sutton (84.8%) and Haydons Road (83.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 23,713 | 84.3% | 9.2% |
Operators with their own page for this station are linked to it.
Late train at Wimbledon Chase? Delay Repay
These operators call at Wimbledon Chase and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,908 | 83.6% | 6.4% |
| Period 6 of 2026-27 | 1,903 | 78.3% | 9.9% |
| Period 5 of 2026-27 | 1,920 | 80.8% | 13.8% |
| Period 4 of 2026-27 | 1,910 | 84.7% | 6.7% |
| Period 3 of 2026-27 | 1,618 | 82.5% | 9.5% |
| Period 2 of 2026-27 | 1,685 | 87.2% | 5.5% |
| Period 1 of 2026-27 | 2,078 | 87.9% | 7.0% |
| Period 13 of 2025-26 | 1,800 | – | 7.5% |
| Period 12 of 2025-26 | 1,964 | 87.9% | 7.9% |
| Period 11 of 2025-26 | 1,895 | 83.4% | 9.4% |
| Period 10 of 2025-26 | 1,394 | 85.6% | 14.3% |
| Period 9 of 2025-26 | 1,788 | 83.0% | 15.9% |
| Period 8 of 2025-26 | 1,850 | 86.1% | 7.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Merton | 23,713 | 83.0% | 9.2% |
| West Sutton | 23,713 | 84.8% | 9.1% |
| Haydons Road | 23,753 | 83.8% | 8.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out