Skewen had 8,714 scheduled stops to Period 7 of 2026-27, about 24 a day. 58.3% of recorded arrivals were within three minutes of the timetable and 2.7% of scheduled stops were cancelled.
Skewen opened on 1 June 1882 and closed to passengers on 2 November 1964. It reopened on 27 June 1994, 32 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Neath is the oldest (1850) and Baglan the newest (1996), with Skewen in between.
The nearest stations to Skewen are Llansamlet (2.7 km west), Neath (2.7 km east), Briton Ferry (3.2 km south-east), Baglan (5.8 km south-east) and Swansea (7.6 km south-west). 6 stations lie within 10 km in all. At 58.3%, Skewen is less punctual than all of them; the best of the five, Swansea, manages 69.0%.
Skewen takes its name from a Village called Skewen, home to about 8,500 people, and the station stands 0.4 km from its centre.
Across the whole run of data, the weakest four-week period for Skewen was Period 9 of 2023-24, at 44.1%, some time before the latest year. The strongest was Period 4 of 2024-25, at 74.9%, and the two are 30.8 percentage points apart. Cancellations peaked at 14.0% of scheduled stops in Period 3 of 2023-24, against 2.7% over the latest 13 periods.
2 of 3 stations of a similar size in Wales are more punctual than Skewen on 58.3%. The comparison group includes Llansamlet (60.0%), Briton Ferry (58.6%) and Baglan (58.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 8,714 | 58.3% | 2.7% |
Operators with their own page for this station are linked to it.
Late train at Skewen? Delay Repay
These operators call at Skewen and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 670 | 57.0% | 2.4% |
| Period 6 of 2026-27 | 677 | 58.6% | 2.5% |
| Period 5 of 2026-27 | 678 | 53.3% | 4.7% |
| Period 4 of 2026-27 | 692 | 56.4% | 5.5% |
| Period 3 of 2026-27 | 690 | 59.7% | 2.0% |
| Period 2 of 2026-27 | 681 | 59.8% | 2.3% |
| Period 1 of 2026-27 | 799 | 61.5% | 2.4% |
| Period 13 of 2025-26 | 750 | 67.7% | 1.5% |
| Period 12 of 2025-26 | 566 | 66.5% | 2.3% |
| Period 11 of 2025-26 | 486 | 67.7% | 2.7% |
| Period 10 of 2025-26 | 643 | 55.5% | 2.5% |
| Period 9 of 2025-26 | 695 | 44.1% | 3.0% |
| Period 8 of 2025-26 | 687 | 53.0% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Llansamlet | 8,714 | 60.0% | 2.7% |
| Briton Ferry | 8,735 | 58.6% | 2.8% |
| Baglan | 8,752 | 58.3% | 2.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out