South Merton
SMOLondonManaged by Govia Thameslink Railway (Thameslink)
How this station is performing
South Merton had 23,713 scheduled stops to Period 7 of 2026-27, about 65 a day. 83.0% of recorded arrivals were within three minutes of the timetable and 9.2% of scheduled stops were cancelled.
South Merton opened on 7 July 1929, 97 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Wimbledon is the oldest (1838) and St Helier (London) the newest (1930), with South Merton in between.
The nearest stations to South Merton are Wimbledon Chase (1.0 km north-west), Morden South (1.0 km south-east), St Helier (London) (1.6 km south), Raynes Park (1.8 km west) and Wimbledon (2.1 km north). 85 stations lie within 10 km in all. Of the five, Raynes Park is the most punctual at 86.4% and Wimbledon the least at 82.8%, with South Merton on 83.0%.
Cancellations are a particular problem at South Merton. 9.2% of scheduled stops did not happen, 3.4 times the national median of 2.7%. Ranked from fewest cancellations to most, the station is 2358th of 2,374.
Compared with 3 stations of a similar size in London, South Merton is the least punctual, at 83.0%. All of them are ahead, including West Sutton (84.8%), Wimbledon Chase (84.3%) and Haydons Road (83.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 23,713 | 83.0% | 9.2% |
Operators with their own page for this station are linked to it.
Late train at South Merton? Delay Repay
These operators call at South Merton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,908 | 79.0% | 6.4% |
| Period 6 of 2026-27 | 1,903 | 76.0% | 9.9% |
| Period 5 of 2026-27 | 1,920 | 75.7% | 13.8% |
| Period 4 of 2026-27 | 1,910 | 84.2% | 6.7% |
| Period 3 of 2026-27 | 1,618 | 81.4% | 9.5% |
| Period 2 of 2026-27 | 1,685 | 86.4% | 5.9% |
| Period 1 of 2026-27 | 2,078 | 86.2% | 7.0% |
| Period 13 of 2025-26 | 1,800 | 88.8% | 7.5% |
| Period 12 of 2025-26 | 1,964 | 86.0% | 6.8% |
| Period 11 of 2025-26 | 1,895 | 82.6% | 9.4% |
| Period 10 of 2025-26 | 1,394 | 86.8% | 14.4% |
| Period 9 of 2025-26 | 1,788 | 81.9% | 16.0% |
| Period 8 of 2025-26 | 1,850 | 84.8% | 7.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Sutton | 23,713 | 84.8% | 9.1% |
| Wimbledon Chase | 23,713 | 84.3% | 9.2% |
| Haydons Road | 23,753 | 83.8% | 8.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out