Corkickle
CKLNorth WestManaged by Northern Trains
How this station is performing
Corkickle had 6,290 scheduled stops to Period 7 of 2026-27, about 17 a day. 75.5% of recorded arrivals were within three minutes of the timetable and 4.5% of scheduled stops were cancelled.
Corkickle opened on 3 December 1855, 171 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Corkickle is the newest; the oldest, Harrington, opened in 1846.
The nearest stations to Corkickle are Whitehaven (1.3 km north), Parton (3.2 km north), St Bees (5.5 km south), Harrington (8.1 km north) and Nethertown (9.6 km south). 5 stations lie within 10 km in all. Of the five, Harrington is the most punctual at 94.1% and Nethertown the least at 66.2%, with Corkickle on 75.5%.
Corkickle takes its name from a suburb called Corkickle, and the station stands 0.0 km from its centre.
Corkickle improved sharply over the past year. In the latest 13 periods 75.5% of stops came within three minutes of the timetable, up 12.0 percentage points from 63.5% in the 13 before. Cancellations fell to 4.5% of scheduled stops from 5.1%, which is 0.6 percentage points fewer.
Compared with 3 stations of a similar size in North West, Corkickle is the most punctual, at 75.5%. The comparison group includes Ravenglass for Eskdale (74.6%), Sellafield (71.8%) and St Bees (73.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 6,290 | 75.5% | 4.5% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 480 | 73.5% | 1.0% |
| Period 6 of 2026-27 | 480 | 80.4% | 4.2% |
| Period 5 of 2026-27 | 480 | 79.2% | 2.7% |
| Period 4 of 2026-27 | 480 | 70.7% | 4.0% |
| Period 3 of 2026-27 | 480 | 76.0% | 4.4% |
| Period 2 of 2026-27 | 480 | 73.5% | 2.5% |
| Period 1 of 2026-27 | 551 | 81.9% | 1.6% |
| Period 13 of 2025-26 | 528 | 80.5% | 4.9% |
| Period 12 of 2025-26 | 481 | 77.7% | 4.0% |
| Period 11 of 2025-26 | 480 | 80.4% | 5.6% |
| Period 10 of 2025-26 | 409 | 79.5% | 13.0% |
| Period 9 of 2025-26 | 480 | 69.4% | 7.3% |
| Period 8 of 2025-26 | 481 | 57.6% | 4.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ravenglass for Eskdale | 6,290 | 74.6% | 4.3% |
| Sellafield | 6,290 | 71.8% | 4.3% |
| St Bees | 6,290 | 73.2% | 4.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out