West Sutton
WSULondonManaged by Govia Thameslink Railway (Thameslink)
How this station is performing
West Sutton had 23,713 scheduled stops to Period 7 of 2026-27, about 65 a day. 84.8% of recorded arrivals were within three minutes of the timetable and 9.1% of scheduled stops were cancelled.
West Sutton opened on 5 January 1930, 96 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, West Sutton is the newest; the oldest, Sutton (London), opened in 1847.
The nearest stations to West Sutton are Sutton Common (1.2 km north-east), Sutton (London) (1.2 km south-east), Cheam (1.3 km south-west), Belmont (2.5 km south) and St Helier (London) (2.6 km north). 67 stations lie within 10 km in all. At 84.8%, West Sutton is less punctual than all of them; the best of the five, Cheam, manages 92.1%.
Cancellations are a particular problem at West Sutton. 9.1% of scheduled stops did not happen, 3.4 times the national median of 2.7%. Ranked from fewest cancellations to most, the station is 2356th of 2,374.
Compared with 3 stations of a similar size in London, West Sutton is the most punctual, at 84.8%. The comparison group includes South Merton (83.0%), Wimbledon Chase (84.3%) and Haydons Road (83.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 23,713 | 84.8% | 9.1% |
Operators with their own page for this station are linked to it.
Late train at West Sutton? Delay Repay
These operators call at West Sutton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,908 | 85.3% | 6.4% |
| Period 6 of 2026-27 | 1,903 | 82.4% | 9.9% |
| Period 5 of 2026-27 | 1,920 | 81.4% | 13.8% |
| Period 4 of 2026-27 | 1,910 | 84.9% | 6.7% |
| Period 3 of 2026-27 | 1,618 | 81.9% | 9.5% |
| Period 2 of 2026-27 | 1,685 | 86.6% | 5.5% |
| Period 1 of 2026-27 | 2,078 | 86.5% | 7.0% |
| Period 13 of 2025-26 | 1,800 | 89.0% | 7.5% |
| Period 12 of 2025-26 | 1,964 | 86.7% | 6.8% |
| Period 11 of 2025-26 | 1,895 | 83.5% | 9.4% |
| Period 10 of 2025-26 | 1,394 | 87.9% | 14.3% |
| Period 9 of 2025-26 | 1,788 | 80.6% | 16.0% |
| Period 8 of 2025-26 | 1,850 | 85.0% | 7.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Merton | 23,713 | 83.0% | 9.2% |
| Wimbledon Chase | 23,713 | 84.3% | 9.2% |
| Haydons Road | 23,753 | 83.8% | 8.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out