Briton Ferry
BNFWalesManaged by TfW Rail
How this station is performing
Briton Ferry had 8,735 scheduled stops to Period 7 of 2026-27, about 24 a day. 58.6% of recorded arrivals were within three minutes of the timetable and 2.8% of scheduled stops were cancelled.
Briton Ferry opened on 8 July 1935 and closed to passengers on 2 November 1964. It reopened on 1 June 1994, 32 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Neath is the oldest (1850) and Baglan the newest (1996), with Briton Ferry in between.
The nearest stations to Briton Ferry are Baglan (2.7 km south), Neath (2.8 km north), Skewen (3.2 km north-west), Llansamlet (5.2 km north-west) and Port Talbot Parkway (5.7 km south-east). 6 stations lie within 10 km in all. Of the five, Port Talbot Parkway is the most punctual at 63.8% and Baglan the least at 58.3%, with Briton Ferry on 58.6%.
Briton Ferry takes its name from a town called Briton Ferry, home to about 5,911 people, and the station stands 0.7 km from its centre.
1 of 3 stations of a similar size in Wales are more punctual than Briton Ferry on 58.6%. The comparison group includes Baglan (58.3%), Llansamlet (60.0%) and Skewen (58.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 8,735 | 58.6% | 2.8% |
Operators with their own page for this station are linked to it.
Late train at Briton Ferry? Delay Repay
These operators call at Briton Ferry and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 670 | 57.8% | 2.4% |
| Period 6 of 2026-27 | 680 | 57.6% | 2.5% |
| Period 5 of 2026-27 | 678 | 53.9% | 4.7% |
| Period 4 of 2026-27 | 692 | 56.4% | 5.6% |
| Period 3 of 2026-27 | 692 | 59.6% | 2.0% |
| Period 2 of 2026-27 | 685 | 59.6% | 2.5% |
| Period 1 of 2026-27 | 803 | 63.0% | 2.5% |
| Period 13 of 2025-26 | 753 | 68.8% | 1.3% |
| Period 12 of 2025-26 | 570 | 68.2% | 2.3% |
| Period 11 of 2025-26 | 486 | 68.1% | 2.7% |
| Period 10 of 2025-26 | 642 | 55.9% | 2.5% |
| Period 9 of 2025-26 | 695 | 43.8% | 3.2% |
| Period 8 of 2025-26 | 689 | 51.0% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Baglan | 8,752 | 58.3% | 2.7% |
| Llansamlet | 8,714 | 60.0% | 2.7% |
| Skewen | 8,714 | 58.3% | 2.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out