Crianlarich
CNRScotlandManaged by ScotRail
How this station is performing
Crianlarich had 6,460 scheduled stops to Period 7 of 2026-27, about 18 a day. 60.4% of recorded arrivals were within three minutes of the timetable and 0.9% of scheduled stops were cancelled.
Crianlarich opened on 7 August 1894, 132 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Crianlarich is the newest; the oldest, Tyndrum Lower, opened in 1873.
The nearest stations to Crianlarich are Upper Tyndrum (7.2 km north-west), Tyndrum Lower (7.6 km north-west), Ardlui (11.7 km south-west), Bridge of Orchy (16.6 km north-west) and Arrochar and Tarbet (21.8 km south). 2 stations lie within 10 km in all. Of the five, Bridge of Orchy is the most punctual at 67.5% and Arrochar and Tarbet the least at 55.6%, with Crianlarich on 60.4%.
Crianlarich takes its name from a Village called Crianlarich, home to about 185 people, and the station stands 0.4 km from its centre.
Across the whole run of data, the weakest four-week period for Crianlarich was Period 13 of 2023-24, at 37.4%, some time before the latest year. The strongest was Period 10 of 2025-26, at 68.0%, and the two are 30.6 percentage points apart. Cancellations peaked at 5.0% of scheduled stops in Period 10 of 2023-24, against 0.9% over the latest 13 periods.
Compared with 3 stations of a similar size in Scotland, Crianlarich is the least punctual, at 60.4%. All of them are ahead, including Reston (76.9%), Carstairs (82.6%) and Auchinleck (90.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 6,179 | 60.4% | 0.9% |
| Caledonian Sleeper | 281 | – | – |
Operators with their own page for this station are linked to it.
Late train at Crianlarich? Delay Repay
These operators call at Crianlarich and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 501 | 60.5% | 0.4% |
| Period 6 of 2026-27 | 502 | 66.4% | 1.0% |
| Period 5 of 2026-27 | 504 | 64.3% | 0.4% |
| Period 4 of 2026-27 | 502 | 55.4% | 0.8% |
| Period 3 of 2026-27 | 501 | 55.4% | 0.6% |
| Period 2 of 2026-27 | 504 | 52.5% | 0.0% |
| Period 1 of 2026-27 | 577 | 67.0% | 0.2% |
| Period 13 of 2025-26 | 553 | 61.0% | 0.7% |
| Period 12 of 2025-26 | 492 | 66.5% | 0.2% |
| Period 11 of 2025-26 | 479 | 55.6% | 1.7% |
| Period 10 of 2025-26 | 413 | 68.0% | 3.1% |
| Period 9 of 2025-26 | 444 | 52.5% | 2.3% |
| Period 8 of 2025-26 | 488 | 59.0% | 1.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Reston | 6,337 | 76.9% | 1.6% |
| Carstairs | 6,793 | 82.6% | 1.6% |
| Auchinleck | 5,720 | 90.4% | 1.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out