Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Bow Brickhill

BWBSouth EastManaged by West Midlands Trains (London Northwestern Railway)

On time, last 13 periods94.8%Great Britain: 83.6%
Cancelled7.3%Great Britain: 3.2%
Stops a day28Scheduled, on average
Punctuality rank148th of 2,374Among ranked stations

How this station is performing

Bow Brickhill had 10,295 scheduled stops to Period 7 of 2026-27, about 28 a day. 94.8% of recorded arrivals were within three minutes of the timetable and 7.3% of scheduled stops were cancelled.

Bow Brickhill opened on 30 November 1905, 121 years before the latest figures here, and has not been moved since. The First World War closed Bow Brickhill on 1 January 1917, and it reopened on 1 May 1919. Among the 5 stations nearest to it with a known opening date, Bletchley is the oldest (1839) and Milton Keynes Central the newest (1982), with Bow Brickhill in between.

The nearest stations to Bow Brickhill are Fenny Stratford (1.6 km west), Bletchley (2.9 km west), Woburn Sands (3.3 km north-east), Aspley Guise (4.7 km north-east) and Milton Keynes Central (6.3 km north-west). 7 stations lie within 10 km in all. At 94.8%, Bow Brickhill is more punctual than every one of them; the best of the five, Fenny Stratford, manages 94.6%.

Bow Brickhill takes its name from a Village called Bow Brickhill, home to about 625 people, and the station stands 1.0 km from its centre.

Compared with 3 stations of a similar size in South East, Bow Brickhill is the most punctual, at 94.8%. The comparison group includes Fenny Stratford (94.6%), Holmwood (85.4%) and Ockley (87.6%).

Period by period

70%80%90%100%2023-242024-252025-262026-27Period 9 of 2023-24: 90.0%Period 10 of 2023-24: 79.2%Period 11 of 2023-24: 75.8%Period 12 of 2023-24: 88.2%Period 13 of 2023-24: 90.6%Period 1 of 2024-25: 93.9%Period 2 of 2024-25: 91.7%Period 3 of 2024-25: 90.4%Period 4 of 2024-25: 94.2%Period 5 of 2024-25: 91.7%Period 6 of 2024-25: 90.1%Period 7 of 2024-25: 89.2%Period 8 of 2024-25: 78.1%Period 9 of 2024-25: 86.2%Period 10 of 2024-25: 90.3%Period 11 of 2024-25: 93.6%Period 12 of 2024-25: 94.1%Period 13 of 2024-25: 94.6%Period 1 of 2025-26: 91.5%Period 2 of 2025-26: 93.9%Period 3 of 2025-26: 95.1%Period 4 of 2025-26: 90.8%Period 5 of 2025-26: 92.5%Period 6 of 2025-26: 91.8%Period 7 of 2025-26: 93.0%Period 8 of 2025-26: 94.4%Period 9 of 2025-26: 94.7%Period 10 of 2025-26: 95.1%Period 11 of 2025-26: 94.5%Period 12 of 2025-26: 96.1%Period 13 of 2025-26: 94.7%Period 1 of 2026-27: 95.9%Period 2 of 2026-27: 94.2%Period 3 of 2026-27: 93.0%Period 4 of 2026-27: 95.1%Period 5 of 2026-27: 93.6%Period 6 of 2026-27: 94.4%Period 7 of 2026-27: 95.6%
This pageGreat Britain
0%5%10%15%20%Period 9 of 2023-24: 9.1%Period 10 of 2023-24: 13.3%Period 11 of 2023-24: 0.0%Period 12 of 2023-24: 7.8%Period 13 of 2023-24: 4.5%Period 1 of 2024-25: 2.9%Period 2 of 2024-25: 11.2%Period 3 of 2024-25: 12.8%Period 4 of 2024-25: 2.6%Period 5 of 2024-25: 11.8%Period 6 of 2024-25: 12.3%Period 7 of 2024-25: 12.0%Period 8 of 2024-25: 13.8%Period 9 of 2024-25: 2.2%Period 10 of 2024-25: 8.2%Period 11 of 2024-25: 0.6%Period 12 of 2024-25: 0.5%Period 13 of 2024-25: 0.5%Period 1 of 2025-26: 0.9%Period 2 of 2025-26: 3.2%Period 3 of 2025-26: 5.5%Period 4 of 2025-26: 6.1%Period 5 of 2025-26: 4.7%Period 6 of 2025-26: 6.7%Period 7 of 2025-26: 8.2%Period 8 of 2025-26: 5.4%Period 9 of 2025-26: 5.0%Period 10 of 2025-26: 3.9%Period 11 of 2025-26: 3.6%Period 12 of 2025-26: 3.1%Period 13 of 2025-26: 4.0%Period 1 of 2026-27: 9.9%Period 2 of 2026-27: 5.3%Period 3 of 2026-27: 8.3%Period 4 of 2026-27: 9.6%Period 5 of 2026-27: 18.6%Period 6 of 2026-27: 17.1%Period 7 of 2026-27: 3.4%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
West Midlands Railway10,29594.8%7.3%

Operators with their own page for this station are linked to it.

Late train at Bow Brickhill? Delay Repay

These operators call at Bow Brickhill and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2781695.6%3.4%
Period 6 of 2026-2775594.4%17.1%
Period 5 of 2026-2769093.6%18.6%
Period 4 of 2026-2770895.1%9.6%
Period 3 of 2026-2781693.0%8.3%
Period 2 of 2026-2774894.2%5.3%
Period 1 of 2026-2791895.9%9.9%
Period 13 of 2025-2688494.7%4.0%
Period 12 of 2025-2681696.1%3.1%
Period 11 of 2025-2681694.5%3.6%
Period 10 of 2025-2669695.1%3.9%
Period 9 of 2025-2681694.7%5.0%
Period 8 of 2025-2681694.4%5.4%

Time of year

75%80%85%90%95%P1: 93.8%1P2: 93.4%2P3: 92.9%3P4: 93.3%4P5: 92.5%5P6: 92.0%6P7: 93.1%7P8: 87.0%8P9: 90.6%9P10: 91.8%10P11: 92.8%11P12: 93.7%12P13: 93.4%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in South East

StationScheduled stopsWithin 3 minCancelled
Fenny Stratford10,29594.6%7.3%
Holmwood9,67685.4%2.1%
Ockley9,67687.6%2.1%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out