Aspley Guise
APGEast of EnglandManaged by West Midlands Trains (London Northwestern Railway)
How this station is performing
Aspley Guise had 10,295 scheduled stops to Period 7 of 2026-27, about 28 a day. 93.7% of recorded arrivals were within three minutes of the timetable and 7.3% of scheduled stops were cancelled.
Aspley Guise opened on 4 November 1905, 121 years before the latest figures here, and has not been moved since. The First World War closed Aspley Guise on 1 January 1917, and it reopened on 5 May 2019. Of the 5 stations nearest to it with a known opening date, Aspley Guise is the newest; the oldest, Woburn Sands, opened in 1846.
The nearest stations to Aspley Guise are Woburn Sands (1.5 km west), Ridgmont (2.7 km east), Bow Brickhill (4.7 km south-west), Lidlington (5.5 km north-east) and Fenny Stratford (6.3 km west). 10 stations lie within 10 km in all. Of the five, Bow Brickhill is the most punctual at 94.8% and Ridgmont the least at 93.3%, with Aspley Guise on 93.7%.
Aspley Guise takes its name from a Village called Aspley Guise, home to about 2,216 people, and the station stands 1.0 km from its centre.
1 of 3 stations of a similar size in East of England are more punctual than Aspley Guise on 93.7%. The comparison group includes Bedford St Johns (89.5%), Kempston Hardwick (93.2%) and Lidlington (93.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 10,295 | 93.7% | 7.3% |
Operators with their own page for this station are linked to it.
Late train at Aspley Guise? Delay Repay
These operators call at Aspley Guise and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 816 | 94.4% | 3.4% |
| Period 6 of 2026-27 | 755 | 94.2% | 17.1% |
| Period 5 of 2026-27 | 690 | 93.1% | 18.6% |
| Period 4 of 2026-27 | 708 | 95.1% | 9.6% |
| Period 3 of 2026-27 | 816 | 92.8% | 8.5% |
| Period 2 of 2026-27 | 748 | 93.4% | 5.3% |
| Period 1 of 2026-27 | 918 | 95.4% | 9.9% |
| Period 13 of 2025-26 | 884 | 93.2% | 4.0% |
| Period 12 of 2025-26 | 816 | 95.1% | 3.1% |
| Period 11 of 2025-26 | 816 | 92.0% | 3.6% |
| Period 10 of 2025-26 | 696 | 93.6% | 3.9% |
| Period 9 of 2025-26 | 816 | 94.0% | 5.0% |
| Period 8 of 2025-26 | 816 | 91.9% | 5.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bedford St Johns | 10,297 | 89.5% | 7.5% |
| Kempston Hardwick | 10,297 | 93.2% | 7.5% |
| Lidlington | 10,297 | 93.9% | 7.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out