Bedford St Johns
BSJEast of EnglandManaged by West Midlands Trains (London Northwestern Railway)
How this station is performing
Bedford St Johns had 10,297 scheduled stops to Period 7 of 2026-27, about 28 a day. 89.5% of recorded arrivals were within three minutes of the timetable and 7.5% of scheduled stops were cancelled.
Bedford St Johns opened on 18 November 1846. It was moved to the site it uses now on 14 May 1984. Of the 5 stations nearest to it with a known opening date, Bedford St Johns is the oldest; the next oldest, Millbrook (Bedfordshire), dates from 1846.
The nearest stations to Bedford St Johns are Bedford (1.1 km north-west), Kempston Hardwick (4.8 km south-west), Stewartby (7.6 km south-west), Millbrook (Bedfordshire) (9.5 km south-west) and Lidlington (11.6 km south-west). 4 stations lie within 10 km in all. Of the five, Lidlington is the most punctual at 93.9% and Bedford the least at 83.4%, with Bedford St Johns on 89.5%.
Bedford St Johns is named after Bedford, a county town, home to about 92,407 people, but the station stands 0.6 km from its centre.
Compared with 3 stations of a similar size in East of England, Bedford St Johns is the least punctual, at 89.5%. All of them are ahead, including Kempston Hardwick (93.2%), Lidlington (93.9%) and Stewartby (92.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 10,297 | 89.5% | 7.5% |
Operators with their own page for this station are linked to it.
Late train at Bedford St Johns? Delay Repay
These operators call at Bedford St Johns and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 816 | 89.9% | 3.7% |
| Period 6 of 2026-27 | 757 | 88.3% | 17.2% |
| Period 5 of 2026-27 | 690 | 90.9% | 19.0% |
| Period 4 of 2026-27 | 708 | 92.5% | 9.5% |
| Period 3 of 2026-27 | 816 | 88.4% | 8.9% |
| Period 2 of 2026-27 | 748 | 87.9% | 5.9% |
| Period 1 of 2026-27 | 918 | 91.6% | 9.9% |
| Period 13 of 2025-26 | 884 | 88.1% | 4.4% |
| Period 12 of 2025-26 | 816 | 89.5% | 3.3% |
| Period 11 of 2025-26 | 816 | 85.8% | 3.9% |
| Period 10 of 2025-26 | 696 | 88.1% | 4.0% |
| Period 9 of 2025-26 | 816 | 92.7% | 5.3% |
| Period 8 of 2025-26 | 816 | 90.5% | 5.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Kempston Hardwick | 10,297 | 93.2% | 7.5% |
| Lidlington | 10,297 | 93.9% | 7.5% |
| Stewartby | 10,297 | 92.5% | 7.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out