Period 6 of 2023-24
Previous periodNext periodAll periods
How the period went
In Period 6 of 2023-24, 6,404,766 scheduled station stops were recorded across Great Britain. 86.3% of recorded arrivals came within three minutes of the timetable and 2.7% of scheduled stops were cancelled.
Compared with Period 5 of 2023-24, the biggest rises among stations with at least 1,500 scheduled stops were at Stonehaven (up 15.4 points to 85.2%), Aberdeen (up 7.2 points to 90.0%), Eskbank (up 7.0 points to 82.1%), Wembley Central (up 7.0 points to 90.8%) and Helsby (up 6.9 points to 83.4%).
Compared with Period 5 of 2023-24, the biggest falls were at Kenley (down 14.4 points to 71.2%), Oxted (down 11.6 points to 81.5%), Hurst Green (down 10.4 points to 83.1%), Worcestershire Parkway (down 10.1 points to 56.3%) and South Croydon (down 9.6 points to 80.4%).
21 stations had their best figure on record in Period 6 of 2023-24; the busiest of them were Kensal Rise (90.0%), Hilsea (89.4%), Ayr (94.8%), Southend Airport (97.9%) and Southend Victoria (98.6%).
The least punctual large stations in Period 6 of 2023-24, with at least 500 scheduled stops, were Penyffordd (38.4%), Neston (38.8%), Pewsey (40.6%), Leominster (44.3%) and Moreton-in-Marsh (45.8%).
Among the 20 larger operators in Period 6 of 2023-24, Greater Anglia was the most punctual at 94.3% and Avanti the least at 66.0%, which are 28.3 percentage points apart.
Least punctual stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Penyffordd | 725 | 38.4% | 2.6% |
| Neston | 725 | 38.8% | 2.6% |
| Pewsey | 537 | 40.6% | 5.2% |
| Leominster | 873 | 44.3% | 4.1% |
| Moreton-in-Marsh | 992 | 45.8% | 3.7% |
| Upton (Merseyside) | 725 | 46.4% | 2.6% |
| Wrexham Central | 688 | 47.2% | 5.5% |
| Ludlow | 1,052 | 48.5% | 4.3% |
Most cancellations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Kendal | 790 | 87.9% | 13.7% |
| Windermere | 790 | 86.8% | 13.7% |
| Burneside (Cumbria) | 740 | 88.0% | 13.6% |
| Staveley (Cumbria) | 740 | 86.5% | 13.6% |
| Chepstow | 1,048 | 73.0% | 11.3% |
| Lydney | 900 | 64.9% | 11.3% |
| Baglan | 509 | 59.9% | 11.2% |
| Briton Ferry | 509 | 57.3% | 11.2% |
Operators
| Operator | Within 3 min | Cancelled |
|---|---|---|
| Greater Anglia | 94.3% | 2.1% |
| London Overground | 93.6% | 2.1% |
| c2c | 93.0% | 1.5% |
| Merseyrail | 92.2% | 2.4% |
| Chiltern Railways | 91.7% | 1.5% |
| ScotRail | 90.9% | 1.8% |
| Elizabeth line | 90.3% | 3.6% |
| Heathrow Express | 88.7% | 5.1% |
| South Western Railway | 87.5% | 1.8% |
| Southeastern | 87.4% | 1.1% |
| GTR | 86.0% | 3.4% |
| West Midlands Railway | 82.7% | 2.8% |
| Northern | 81.1% | 4.8% |
| Transport for Wales | 78.2% | 3.1% |
| LNER | 76.2% | 1.4% |
| Great Western Railway | 75.6% | 3.8% |
| East Midlands Railway | 74.8% | 2.1% |
| TransPennine Express | 70.3% | 2.9% |
| CrossCountry | 69.4% | 3.8% |
| Avanti | 66.0% | 2.6% |
Areas
| Area | Within 3 min | Cancelled |
|---|---|---|
| Scotland | 90.8% | 1.8% |
| London | 90.5% | 2.5% |
| East of England | 88.7% | 2.5% |
| South East | 85.2% | 2.4% |
| North West | 84.4% | 3.5% |
| West Midlands | 80.3% | 2.8% |
| North East | 79.2% | 4.0% |
| Wales | 78.8% | 3.3% |
| East Midlands | 77.9% | 2.4% |
| Yorkshire and The Humber | 77.6% | 4.6% |
| South West | 74.6% | 3.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out