Period 5 of 2023-24
Previous periodNext periodAll periods
How the period went
In Period 5 of 2023-24, 6,425,306 scheduled station stops were recorded across Great Britain. 87.1% of recorded arrivals came within three minutes of the timetable and 3.2% of scheduled stops were cancelled.
Compared with Period 4 of 2023-24, the biggest rises among stations with at least 1,500 scheduled stops were at Northfleet (up 11.3 points to 86.4%), Greenhithe for Bluewater (up 9.7 points to 89.7%), Tame Bridge Parkway (up 9.3 points to 88.3%), Swanscombe (up 8.9 points to 89.2%) and Worcestershire Parkway (up 8.6 points to 66.4%).
Compared with Period 4 of 2023-24, the biggest falls were at Avonmouth (down 12.9 points to 72.7%), Gorebridge (down 12.3 points to 72.4%), Eskbank (down 11.3 points to 75.1%), Theale (down 10.4 points to 67.4%) and Clifton Down (down 10.0 points to 75.9%).
125 stations had their best figure on record in Period 5 of 2023-24; the busiest of them were Clapham Junction (92.1%), Stratford (London) (94.5%), London Waterloo (93.2%), Vauxhall (92.8%) and Wimbledon (94.9%).
5 stations had their worst figure on record in Period 5 of 2023-24; the busiest of them were Bushey (80.0%), Theale (67.4%), Wembley Central (83.8%), Gorebridge (72.4%) and Tweedbank (79.7%).
Among the 20 larger operators in Period 5 of 2023-24, c2c was the most punctual at 95.4% and Avanti the least at 67.1%, which are 28.3 percentage points apart.
Least punctual stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Pewsey | 570 | 35.0% | 12.8% |
| Leominster | 1,099 | 39.2% | 3.5% |
| Neston | 652 | 43.3% | 3.2% |
| Gwersyllt | 652 | 44.2% | 4.1% |
| Penyffordd | 652 | 45.2% | 4.0% |
| Cefn-y-bedd | 652 | 48.1% | 4.1% |
| Caergwrle | 652 | 48.5% | 4.1% |
| Heswall | 652 | 48.6% | 3.2% |
Most cancellations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Atherstone | 867 | 62.0% | 15.2% |
| Ifield | 1,541 | 81.9% | 13.6% |
| Berkhamsted | 3,722 | 80.0% | 13.1% |
| Custom House | 8,572 | 93.9% | 12.9% |
| Littlehaven | 1,641 | 80.6% | 12.9% |
| Tring | 3,643 | 80.8% | 12.9% |
| Woolwich | 8,572 | 93.9% | 12.9% |
| Canary Wharf | 8,572 | 93.9% | 12.8% |
Operators
| Operator | Within 3 min | Cancelled |
|---|---|---|
| c2c | 95.4% | 0.5% |
| Greater Anglia | 95.2% | 0.9% |
| London Overground | 94.4% | 2.1% |
| Chiltern Railways | 93.0% | 1.5% |
| Elizabeth line | 92.2% | 7.9% |
| Merseyrail | 92.2% | 1.5% |
| ScotRail | 90.6% | 1.5% |
| South Western Railway | 89.9% | 1.5% |
| Heathrow Express | 89.3% | 3.9% |
| Southeastern | 89.0% | 1.5% |
| GTR | 88.3% | 3.3% |
| West Midlands Railway | 83.6% | 6.2% |
| Northern | 80.7% | 5.6% |
| Transport for Wales | 77.0% | 3.8% |
| East Midlands Railway | 76.3% | 1.9% |
| LNER | 76.2% | 2.1% |
| Great Western Railway | 76.1% | 4.8% |
| CrossCountry | 71.9% | 5.0% |
| TransPennine Express | 68.1% | 5.3% |
| Avanti | 67.1% | 3.7% |
Areas
| Area | Within 3 min | Cancelled |
|---|---|---|
| London | 92.4% | 3.0% |
| East of England | 90.9% | 2.6% |
| Scotland | 90.3% | 1.5% |
| South East | 86.4% | 2.7% |
| North West | 83.4% | 3.4% |
| West Midlands | 81.6% | 4.9% |
| East Midlands | 79.2% | 2.6% |
| North East | 78.9% | 5.0% |
| Wales | 78.1% | 4.0% |
| Yorkshire and The Humber | 77.7% | 6.4% |
| South West | 74.4% | 4.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out