Lydney
LYDSouth WestManaged by TfW Rail
How this station is performing
Lydney had 14,789 scheduled stops to Period 7 of 2026-27, about 41 a day. 68.1% of recorded arrivals were within three minutes of the timetable and 6.5% of scheduled stops were cancelled.
Lydney opened on 19 September 1851. It was moved to the site it uses now on 20 October 1879. Among the 5 stations nearest to it with a known opening date, Stonehouse is the oldest (1845) and Severn Beach the newest (1922), with Lydney in between.
Lydney is remote: its nearest neighbours are Cam and Dursley (11.8 km east), Chepstow (12.7 km south-west), Stonehouse (17.6 km east), Pilning (18.8 km south) and Severn Beach (19.5 km south-west). At 68.1%, Lydney is less punctual than all of them; the best of the five, Severn Beach, manages 79.1%.
Lydney takes its name from a town called Lydney, home to about 10,038 people, and the station stands 1.6 km from its centre.
2 operators call at Lydney: Transport for Wales (65.8%, 72% of stops) and CrossCountry (74.7%, 28% of stops). The operator you travel with matters: CrossCountry reaches 74.7% within three minutes while Transport for Wales manages 65.8%, a gap of 8.9 percentage points.
2 of 3 stations of a similar size in South West are more punctual than Lydney on 68.1%. The comparison group includes Moreton-in-Marsh (56.4%), Moreton (Dorset) (75.2%) and Bedwyn (78.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 10,593 | 65.8% | 3.8% |
| CrossCountry | 4,196 | 74.7% | 13.3% |
Operators with their own page for this station are linked to it.
Late train at Lydney? Delay Repay
These operators call at Lydney and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,123 | 64.1% | 7.3% |
| Period 6 of 2026-27 | 1,084 | 63.9% | 10.8% |
| Period 5 of 2026-27 | 953 | 53.1% | 13.9% |
| Period 4 of 2026-27 | 1,034 | 64.5% | 8.2% |
| Period 3 of 2026-27 | 1,128 | 70.5% | 5.5% |
| Period 2 of 2026-27 | 1,168 | 65.1% | 8.9% |
| Period 1 of 2026-27 | 1,344 | 74.1% | 2.9% |
| Period 13 of 2025-26 | 1,267 | 73.8% | 2.8% |
| Period 12 of 2025-26 | 1,169 | 75.0% | 2.8% |
| Period 11 of 2025-26 | 1,151 | 80.1% | 3.4% |
| Period 10 of 2025-26 | 1,050 | 64.6% | 8.3% |
| Period 9 of 2025-26 | 1,171 | 60.3% | 9.5% |
| Period 8 of 2025-26 | 1,147 | 68.6% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Moreton-in-Marsh | 14,688 | 56.4% | 4.3% |
| Moreton (Dorset) | 14,908 | 75.2% | 4.9% |
| Bedwyn | 14,970 | 78.4% | 3.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out