Upton (Merseyside)
UPTNorth WestManaged by TfW Rail
How this station is performing
Upton (Merseyside) had 13,328 scheduled stops to Period 7 of 2026-27, about 37 a day. 77.1% of recorded arrivals were within three minutes of the timetable and 4.0% of scheduled stops were cancelled.
Upton (Merseyside) opened on 18 May 1896, 130 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Upton (Merseyside) is the newest; the oldest, Bidston, opened in 1866.
The nearest stations to Upton (Merseyside) are Bidston (2.5 km north), Leasowe (2.6 km north-west), Birkenhead North (2.7 km north-east), Moreton (Merseyside) (3.0 km north-west) and Birkenhead Park (3.2 km east). 35 stations lie within 10 km in all. Of the five, Birkenhead North is the most punctual at 91.6% and Leasowe the least at 72.4%, with Upton (Merseyside) on 77.1%.
Upton (Merseyside) is named after Upton, a Village, home to about 16,130 people, but the station stands 1.0 km from its centre.
Across the whole run of data, the weakest four-week period for Upton (Merseyside) was Period 1 of 2023-24, at 27.0%, some time before the latest year. The strongest was Period 5 of 2024-25, at 88.2%, and the two are 61.2 percentage points apart. Cancellations peaked at 28.6% of scheduled stops in Period 1 of 2023-24, against 4.0% over the latest 13 periods.
1 of 3 stations of a similar size in North West are more punctual than Upton (Merseyside) on 77.1%. The comparison group includes Heswall (75.6%), Neston (76.1%) and Strines (90.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 13,328 | 77.1% | 4.0% |
Operators with their own page for this station are linked to it.
Late train at Upton (Merseyside)? Delay Repay
These operators call at Upton (Merseyside) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,068 | 73.6% | 3.6% |
| Period 6 of 2026-27 | 778 | 72.6% | 5.0% |
| Period 5 of 2026-27 | 801 | 74.4% | 6.5% |
| Period 4 of 2026-27 | 1,068 | 81.1% | 5.0% |
| Period 3 of 2026-27 | 1,068 | 80.9% | 6.8% |
| Period 2 of 2026-27 | 1,068 | 82.9% | 2.7% |
| Period 1 of 2026-27 | 1,232 | 78.4% | 2.5% |
| Period 13 of 2025-26 | 1,171 | 83.5% | 1.6% |
| Period 12 of 2025-26 | 1,068 | 83.4% | 2.8% |
| Period 11 of 2025-26 | 1,000 | 77.8% | 4.1% |
| Period 10 of 2025-26 | 972 | 71.8% | 7.0% |
| Period 9 of 2025-26 | 1,012 | 67.3% | 4.2% |
| Period 8 of 2025-26 | 1,022 | 70.9% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out