Burneside (Cumbria)
BUDNorth WestManaged by Northern Trains
How this station is performing
Burneside (Cumbria) has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 10,932 scheduled stops, about 30 a day. In those periods 85.8% of stops arrived within three minutes of the timetable and 2.3% of scheduled stops were cancelled.
Burneside (Cumbria) opened on 21 April 1847, 179 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Kendal is the oldest (1846) and Arnside the newest (1858), with Burneside (Cumbria) in between.
The nearest stations to Burneside (Cumbria) are Kendal (3.2 km south-east), Staveley (Cumbria) (4.0 km north-west), Oxenholme Lake District (6.3 km south-east), Windermere (9.2 km west) and Arnside (17.5 km south). 4 stations lie within 10 km in all. Of the five, Kendal is the most punctual at 86.3% and Oxenholme Lake District the least at 56.2%, with Burneside (Cumbria) on 85.8%.
Burneside (Cumbria) is named after Burneside, a Village, home to about 1,888 people, but the station stands 0.3 km from its centre.
2 of 3 stations of a similar size in North West are more punctual than Burneside (Cumbria) on 85.8%. The comparison group includes Staveley (Cumbria) (85.0%), Fairfield (89.1%) and Burscough Junction (89.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 10,932 | 85.8% | 2.3% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 840 | 82.7% | 1.4% |
| Period 6 of 2026-27 | 838 | 86.5% | 1.8% |
| Period 5 of 2026-27 | 840 | 83.8% | 2.3% |
| Period 4 of 2026-27 | 840 | 81.0% | 2.0% |
| Period 3 of 2026-27 | 840 | 83.0% | 4.0% |
| Period 2 of 2026-27 | 840 | 86.8% | 2.7% |
| Period 1 of 2026-27 | 934 | – | 1.8% |
| Period 13 of 2025-26 | 922 | 90.9% | 1.8% |
| Period 12 of 2025-26 | 826 | 86.9% | 1.5% |
| Period 11 of 2025-26 | 818 | 93.3% | 2.1% |
| Period 10 of 2025-26 | 714 | 91.0% | 1.7% |
| Period 9 of 2025-26 | 840 | 83.3% | 2.9% |
| Period 8 of 2025-26 | 840 | 81.1% | 3.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Staveley (Cumbria) | 10,932 | 85.0% | 2.3% |
| Fairfield | 11,161 | 89.1% | 2.2% |
| Burscough Junction | 10,638 | 89.4% | 4.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out