How this station is performing
Kendal has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 11,636 scheduled stops, about 32 a day. In those periods 86.3% of stops arrived within three minutes of the timetable and 2.3% of scheduled stops were cancelled.
Kendal opened on 22 September 1846, 180 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Kendal is the oldest; the next oldest, Oxenholme Lake District, dates from 1846.
The nearest stations to Kendal are Burneside (Cumbria) (3.2 km north-west), Oxenholme Lake District (3.2 km south), Staveley (Cumbria) (7.1 km north-west), Windermere (11.8 km north-west) and Arnside (15.5 km south). 3 stations lie within 10 km in all. At 86.3%, Kendal is more punctual than every one of them; the best of the five, Windermere, manages 85.8%.
Kendal takes its name from a town called Kendal, home to about 29,594 people, and the station stands 0.8 km from its centre.
Compared with 3 stations of a similar size in North West, Kendal is the most punctual, at 86.3%. The comparison group includes Windermere (85.8%), Ashton-under-Lyne (81.6%) and Euxton Balshaw Lane (84.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 11,636 | 86.3% | 2.3% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 896 | 82.9% | 1.8% |
| Period 6 of 2026-27 | 894 | 86.3% | 1.8% |
| Period 5 of 2026-27 | 896 | 84.3% | 2.1% |
| Period 4 of 2026-27 | 896 | 81.9% | 1.9% |
| Period 3 of 2026-27 | 896 | 84.7% | 3.9% |
| Period 2 of 2026-27 | 896 | 87.8% | 2.7% |
| Period 1 of 2026-27 | 976 | – | 2.0% |
| Period 13 of 2025-26 | 984 | 91.5% | 1.9% |
| Period 12 of 2025-26 | 882 | 87.1% | 1.4% |
| Period 11 of 2025-26 | 872 | 93.2% | 1.9% |
| Period 10 of 2025-26 | 756 | 91.0% | 1.9% |
| Period 9 of 2025-26 | 896 | 83.8% | 2.9% |
| Period 8 of 2025-26 | 896 | 81.3% | 3.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Windermere | 11,638 | 85.8% | 2.3% |
| Ashton-under-Lyne | 11,543 | 81.6% | 3.4% |
| Euxton Balshaw Lane | 11,746 | 84.2% | 2.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out